Periodic Inspection
1. Periodic inspection items and intervals
G-2
In order to use a gas heat pump (GHP) air conditioning system for a long time, periodic inspections need to
be performed by a specialist service person.
Sanyo operates a yearly periodic inspection contract system, so customers are encouraged to take out a
contract when they purchase GHP.
After a contract is concluded, a specialist service person will visit to perform periodic inspections at intervals
based on the number of hours of operation and depending on the periodic inspection content.
For further details regarding the contract, consult with the dealer where this system was purchased or our
service company.
(1) Test run
Note:
If any installation work problem is found during
the test run, the customer should request that
the contractor that installed the equipment
remedy the problem.
Ins
pec
tion items
(Test run inspection)
•
Verification of installation work
•
Inspection of electrics
•
Inspection of main unit
•
Inspection of engine system
•
Inspection of safety protection devices
•
Acquisition of operation data
•
Check for gas leaks
(2) Warranty period
The period of warranty is one year from the day of completion of hand-over of the equipment after
performing a test run.
However, for the engine and parts requiring periodic replacement, the period shall be the shorter of one
year from the date of completion of hand-over of the system after performing a test run or 2,000
operating hours.
Содержание ECO G SGP-EGW190M2G2W
Страница 3: ...A 1 System Configuration Contents 1 Type Configuration 1 Outdoor unit A 2 ...
Страница 9: ...Outdoor Unit 3 External Dimensions B 5 ...
Страница 10: ...Outdoor Unit 4 Wiring Diagram B 9 ...
Страница 13: ...Outdoor Unit 6 Operating Sound Level Characteristics B 9 1 Standard Mode ...
Страница 14: ...Outdoor Unit 6 Operating Sound Level Characteristics B 10 2 Quiet Mode ...
Страница 17: ...Control 1 System Block Diagram C 2C 2 ...
Страница 18: ...Control Related 2 Remote Control Warning List C 3 ...
Страница 19: ...Control Related 2 Remote Control Warning List C 4 ...
Страница 20: ...Control Related 2 Remote Control Warning List C 5 ...
Страница 23: ...System Design 1 Operating temperature ranges for heating and cooling D 3 temperature is below 10ºC ...
Страница 25: ...System Design 2 Refrigerant piping design D 4 2 Selecting system header and branch piping sizes ...
Страница 40: ...Installation Work 1 Points regarding refrigerant pipe work E 2 1 Points regarding branch pipe work APR P160BG ...
Страница 41: ...Installation Work 1 Points regarding refrigerant pipe work E 3 APR P680BG ...
Страница 42: ...Installation Work 1 Points regarding refrigerant pipe work E 4 APR P1350BG ...
Страница 43: ...Installation Work 1 Points regarding refrigerant pipe work E 5 APR CHP680BG APR CHP1350BG ...
Страница 48: ...Installation Work 2 Points regarding electrical work outdoor unit E 10 1 Wiring thickness and device capacity ...
Страница 50: ...Installation Work 2 Points regarding electrical work outdoor unit E 12 3 Precautions regarding electrical work ...
Страница 51: ...Installation Work 2 Points regarding electrical work outdoor unit E 13 ...
Страница 52: ...Installation Work 3 Outdoor unit installation work E 14 ...
Страница 53: ...Installation Work 3 Outdoor unit installation work E 15 ...
Страница 54: ...Installation Work 3 Outdoor unit installation work E 16 ...
Страница 55: ...Installation Work 3 Outdoor unit installation work E 17 ...
Страница 56: ...Installation Work 3 Outdoor unit installation work E 18 ...
Страница 57: ...Installation Work 3 Outdoor unit installation work E 19 ...
Страница 58: ...Installation Work 3 Outdoor unit installation work E 20 ...
Страница 59: ...Installation Work 3 Outdoor unit installation work E 21 ...
Страница 60: ...Installation Work 3 Outdoor unit installation work E 22 ...
Страница 61: ...Installation Work 3 Outdoor unit installation work E 23 ...
Страница 62: ...Installation Work 3 Outdoor unit installation work E 24 ...
Страница 63: ...Installation Work 3 Outdoor unit installation work E 25 ...
Страница 64: ...Installation Work 3 Outdoor unit installation work E 26 ...
Страница 65: ...Installation Work 3 Outdoor unit installation work E 27 ...
Страница 66: ...Installation Work 3 Outdoor unit installation work E 28 ...
Страница 67: ...Installation Work 3 Outdoor unit installation work E 29 ...
Страница 68: ...Installation Work 3 Outdoor unit installation work E 30 ...
Страница 69: ...Installation Work 3 Outdoor unit installation work E 31 ...
Страница 70: ...Installation Work 3 Outdoor unit installation work E 32 ...
Страница 71: ...Installation Work 3 Outdoor unit installation work E 33 ...
Страница 72: ...F 1 Separately Sold Parts Contents 1 Outdoor unit related parts 1 Exhaust extension kit SGP PEX560K F 2 ...