4-36
MACHINE OPERATION
SY95C Excavator OMM
0003910
Figure 4-85
NOTE:
Keep the lifting devices between 30° and 40° (1).
0002343
Figure 4-86
8. Use wire ropes and a container spreader bar (2) that
have adequate length to prevent machine damage.
9. Pass the wire ropes under the tracks as shown, and
anchor the ropes on the crane hook.
10. Lift the machine 10 in.–12 in. (25 cm–30 cm) and
check its balance. If it is not balanced, lower the
machine to the ground and adjust the boom or dozer
blade positions.
1
2
Содержание SY95C
Страница 2: ...Page Intentionally Blank ...
Страница 146: ...5 48 MAINTENANCE SY95C Excavator OMM Page Intentionally Blank ...
Страница 151: ...SPECIFICATIONS 6 5 SY95C Excavator OMM Load Point Radius and Height 0003873 Figure 6 3 ...
Страница 154: ...6 8 SPECIFICATIONS SY95C Excavator OMM Page Intentionally Blank ...
Страница 164: ...I 6 SY95C Excavator OMM ...
Страница 165: ...Page Intentionally Blank ...