ASSEMBLY & SET UP
Page 12
STEP 5 - INSTALLATION ACTUATOR ROD
1- Place the Actuator Rod as shown
on picture
(See Fig 1)
2- Insert the long screws and nuts into
the first holes of the rod, connecting
the Pedal Assembly and Actuator Rod
(See Fig 1)
3- Install the screw and nut.
(See Fig 3)
4- Make sure rod mechanism can
move up and down easily.
(See Fig 2)
IMPORTANT:
DO NOT OVERTIGHTEN THE SCREW AS THE
PEDAL & ACTUATOR TAB MUST BE ABLE TO
MOVE UP & DOWN FREELY.
(See Fig 2)
Fig 1.
Fig 2.
Fig 3.
Содержание MKC-HSS-P-2020-BL-004
Страница 16: ...PRODUCT VISUALS Page 16 HAND SANITIZER DISPENSER STATION with 1 liter 32oz Holders Container...
Страница 17: ...PRODUCT VISUALS Page 17 HAND SANITIZER DISPENSER STATION with 1 Gallon Holders Container...
Страница 18: ...PRODUCT VISUALS Page 18 HAND SANITIZER DISPENSER STATION with 1 2 Gallon Holders Container...