background image

Feet Installation

1.

Turn bath upside down on a clean carpet or blanket.

2.

Place feet on points A as indicated on Figure.2

*

The front and back

 sets are not the same.

3.

Place the feet on the bottom of the bath and seal with

 

silicone adhesive.

4.

Leave to dry for 24hrs.

5.

Turn the bath upright and using a spirit level check that

 

bath does not wobble and stands sturdy over the drain

 

waste line.

Plumbing Installation

6.

Plumber inserts plug into waste hole of bath.

7.

Install drain supplied with Pop Up drain kit onto waste

 

installed in Step 1.

8.

Set up drain waste kit, apply plumbers’ putty to drain

 

waste basket, screw in Pop Up drain kit.

!

-

The tubs weight may vary.

 

We

 

recommend that the installation be 

done by 2 people, as a security

 

precaution.

-

Also, make sure to adopt a good posture when lifting the tub.

-

The diagrams in this guide are not construction plans; they are visual

 

aids.

Tools

fig. 1

fig. 2

Nikki filler spout/

overflow

Soft-touch pop drain

Drain nut, use only if 

tubular brass

 

connection 

is in use

Direct verticle/90 

degree Elbow drai

waste

Отзывы: