Installation & Operation Manual Merlin 1000S+
1000S+
IOM
Rev: 9 07-20
3
INSTALLATION
Planning
The Merlin 1000S+ gas pressure proving and electric isolation system is designed specifically
for use in educational establishments and laboratories.
This panel is to be used to carry out a gas proving test on the pipe work in order to highlight if
there is a gas appliance open or a gas leak in a laboratory or similar environment.
The Merlin 1000S+ is designed to give the teacher full control over the incoming gas supply
and bench electrics with the lockable main key-switch and touch sensors.
The Merlin 1000S+ can work in conjunction with carbon dioxide, natural gas, carbon
monoxide and LPG sensors. The Merlin 1000S+ also has a built in “timeout” facility which will
automatically shut off the gas solenoid valve at the end of a specific time period, this time
period can be adjusted to 2, 5, 8 hours or can be overridden if required.
Fixing - Mounting
Unpack all the parts!
1.
Carefully remove the front cover from the unit by unscrewing the four bolts located at each
corner. To do this – use the socket wrench provided.
2.
Mark the four screw holes located on the back of the enclosure to the wall. Ensure the wall
surface is flat to prevent base distortion.
3.
After executing the mounting and the connections – replace the front cover and insert the
security caps over the four bolts.
Please refer to your detector manual for important information regarding coverage,
location and positioning including areas and conditions to avoid.
Be careful when creating access for cables – Damage to boards will void any warranty.
Carefully remove the circuit board before drilling cable entry holes.