background image

Installation & Operation Manual                                                                                   Merlin 1000S+ 

 

 

 

 

1000S+

 

IOM

 

Rev: 9    07-20

 

10 

 

OPERATION 

   First Power Up 

 
On connecting mains power, an LED on the front of the panel (S&S Logo) will illuminate red.  
 

1.

 

Turn the key switch to on position.  

2.

 

Gas & electric will flash for 10 seconds. 

3.

 

Press relevant service button to turn required utility on. 
Turn the key switch to the off position to turn the panel off. 

 

Note: All services can be turned on or off within 10 seconds only of the key switch being turned 

on. After 10 seconds, all utility buttons will be disabled.  

The user must turn the key off and back on to adjust any services.  

 

   Emergency Shut Off Button 

 

The emergency shut off button is located on the front of the panel.  
There is also a facility for remote shut off buttons to be wired in series on the circuit board. 
 
The emergency shut off button(s) will cut off the gas supply and electrics only when activated.  
To reinstate the system, the emergency shut off button(s) will need to be reset and the panel 
restarted.  

 

   LED Indicators 

 

 

Gas  

When the key switch is turned on, the system will check the installation for gas leaks.  
If gas proving is successful, the LED will illuminate.

  

ON = Gas On  
OFF = Gas Off 
 

 

 

Electric

  

When Electric service is turned on, the Electric LED will illuminate.     

   

                

ON = Electric On 
FLASHING = Electric Off, Electric button enabled 
OFF = Electric Off, Electric button disabled. 
 

 

 

Testing  

This LED will illuminate GREEN for approximately 30 seconds when the panel is checking the 
integrity of the gas installation upon start up.  
ON = proving the gas line, do NOT operate any appliances. 
 
 
 

Содержание Merlin 1000S+

Страница 1: ...l Please read this manual carefully and retain for future use The Merlin 1000S gas pressure proving and electric isolation system is designed specifically for use in educational establishments and lab...

Страница 2: ...unting 3 Typical Installation Arrangement 4 Terminal Connections 4 Switch Settings 7 Specification 9 OPERATION 10 First Power Up 10 Emergency Shut Off Button 10 LED Indicators 10 Servicing General Mai...

Страница 3: ...eout facility which will automatically shut off the gas solenoid valve at the end of a specific time period this time period can be adjusted to 2 5 8 hours or can be overridden if required Fixing Moun...

Страница 4: ...SOLENOID VALVE OUTPUT 240VAC electrical power supplied from the VALVE OUT connector using a 3 core cable can be connected to a gas solenoid valve which can shut the gas supply on alarm status Pressur...

Страница 5: ...and screwed into the downstream port of the gas solenoid valve Connect the pressure sensor as shown Red Black Blue IN The sensor will monitor the gas supply pressure and if pressure drops below 12mbar...

Страница 6: ...ect a Merlin CO2 monitor to shut off the system in the event of a high concentration of CO2 If no CO2 monitor is connected the panel will beep upon power up and the CO2 LED will flash 3 times to indic...

Страница 7: ...her on or off valve open or valve closed This will tell the BMS whether or not power is being sent to the solenoid valve OFF Signals the BMS when gas is on or gas is off Default ON Signals the BMS on...

Страница 8: ...2 These can be configured to select the required timeout shut down period TIME 1 TIME 2 Timeout Period OFF OFF 2 Hours Default ON OFF 4 Hours OFF ON 8 Hours ON ON Disabled Note Upon timeout the gas su...

Страница 9: ...rical Contactor Output 100 240V AC Current Consumption 12W max 50mA Internal Fuse 3 15A Operating Temperature 32 104 F 0 95 RH Non Condensing Audible Alarm Buzzer dB 65 dB 300mm distance in quiet cond...

Страница 10: ...front of the panel There is also a facility for remote shut off buttons to be wired in series on the circuit board The emergency shut off button s will cut off the gas supply and electrics only when...

Страница 11: ...R when auto shut down has occurred OFF OK ON Auto shut down activated EM Stop If an emergency shut off button either remote or on the panel is pressed the LED will illuminate AMBER and the gas will be...

Страница 12: ...rs or monitors NEVER paint devices Paint will seal vents and may interfere with devices It is recommended that any detectors connected to the system are inspected and serviced at least annually from t...

Страница 13: ...safely If the bump test results are not within the acceptable range the gas detector must not be used until a full calibration has been conducted Bump testing has a number of benefits for the end use...

Страница 14: ...ering or other causes not arising from defects in material or workmanship This warranty extends to the original consumer purchaser of the product only Warranty disclaimers Any implied warranties arisi...

Страница 15: ...Installation Operation Manual Merlin 1000S 1000S IOM Rev 9 07 20 15 Notes...

Страница 16: ...Installation Location Organisation Stamp Signature of the installer S S Northern Head Office Tel 44 0 1257 470 983 Fax 44 0 1257 471 937 www snsnorthern com info snsnorthern com South East Division T...

Отзывы: