5-
Remove the transmission top cover. Remove the
neutral indicator switch, vent line and fitting from
the transmission top cover.
6-
Install the neutral indictor switch, vent line and
fitting on the new S&S transmission top cover (S&S
PN 56-1615).
7-
Slide the oil feed line (S&S PN 31-0449) through the
hole in the top cover closest to the oil filler/dipstick
boss. Place a new top cover gasket (S&S PN 56-1261)
on the transmission case and position the new S&S
®
top cover on it. Rotate the oil feed line so it will pass
through the
1
⁄
2
” hole in the baffle. Be sure the bend
in the oil feed line orientation is to the rear of the
motorcycle.
See Picture 9.
8-
Install the transmission top cover screws and
washers according to Detail A. Use blue threadlock
on the screws, but leave them loose at this time.
See
Detail A in exploded view of replacement parts for
Harley-Davidson
®
Dyna
®
on page 11.
9-
Remove the oil line retention plate, plugs and seals
from the top of the engine crankcase. Remove seals
from the plugs. Discard the plugs.
10- To install the oil lines (S&S PN 31-0447 and 31-0448),
orient the ends and openings so they are parallel.
Insert the lines through the oil line retention plates,
then the included washers (S&S PN 50-0439) and,
last the seals (S&S PN 50-8271) on each line end.
The ends of the lines should protrude through the
seals about
1
⁄
8
inch.
11- Position oil line assembly on both the transmission
top cover and crankcase and press down until lines
are firmly seated in the counterbores in the
crankcase and transmission cover.
10
Picture 9
Picture 8a
Picture 10
Picture 11
Picture 8