9
COIN PAYOUT ROUTINE (work only on MDB)
If the ENTER button is activated at the "CPO" prompt the VMC will enter the coin payout
routine. Upon entry into this routine the display will show the lowest coin value
dispensable. Pressing the UP button will increase the display to the next highest coin
value, the DOWN will decrease to the next lowest coin values. When the changer has only
3 tubes, the fourth value will display to 0, means don 't exist the fourth tube.
Pushing the button number 5 to a corresponding coin value the display will show
the number of coins in the tube reported by the changer .
Pressing the ENTER button will pay out the displayed coin type.
Activation of the HOME button while a coin value is displayed will return the VMC to the
"CPO" prompt.
TUBE FILL ROUTINE (work only on MDB)
If the ENTER button is activated at the "TUFL" prompt the VMC will enter the tube fill
routine and will show the value of the coin introduced.
The purpose of this routine is to allow the operator to fill the tubes by entering them
through the acceptor and thus have total coin accountability, if they so choose.
Upon entry into this routine the VMC will enable acceptance of any coin type that will be
routed to an inventory tube and disable all others.
The VMC will count and display all inventoried coins and will not disable the acceptor from
taking coins when the highest price setting is reached.
Activation of HOME button while a coin inventory is displayed will return the VMC to the
"TUFL" prompt.
TEST ROUTINE
If the ENTER button is activated at the "TEST" prompt the VMC will enter the TEST vend
routine.
Upon entry into this routine the display will show the first TEST routine " VEND" or the
description of the TEST routine available are the follows:
“ VEND” to TEST the vend motor on master machine
” VENDS” to TEST the vend motor on a slave machine (only if slave is enable)
“SL”
to TEST selection switch
“RELAY” to TEST the relays that command the light
“TEMP” to read the master and slave probe temperature
“POWER” to visualize the data of the last 6 power on and off operations.
“LIFT”
to TEST the lift (if installed)
Содержание Vendo G-SNACK
Страница 1: ...G SNACK G SNACK PLUS MASTER SLAVE PROGRAMMING MANUAL...
Страница 3: ...2...