Installation
on
S&C Mounting Pedestals
Figure 29. With the pole-unit lifted off the ground, check the gas-pressure
gauge on the underside of each pole-unit base.
Shipping brace
Pole-unit indicators
Step 28
With the foam wrapping around the pole-unit
base removed and the pole-unit lifted off the
ground, check that the gas-pressure gauge on
the underside of the pole-unit base is in the “OK”
to operate zone. See Figures 29 and 30.
NOTICE
The gas-pressure gauge needle should be in
the “OK” to operate zone .
If the gauge is not
in this position, stop the installation and
notify S&C Electric Company.
Figure 30. Check that the gas-pressure gauge on each pole-unit is in the
“OK” to operate zone.
“OK” to operate zone
18