S&C Instruction Sheet 765-510 13
Figure 6. Typical pole-band attachment detail (vertical
mounting configuration illustrated).
●
Install four lag screws on the front of the mounting bracket.
Install one lag screw to the center of the pole band.
½
-inch lag
screw
●
Pole mounting
bracket
Pole band
¼
×
1
×
3-inch
stiffening block
J-bolt
Through-bolt
Installation
Installing the Optional Pole Band
STEP 4.
Secure the pole-band (optional) to the mounting
bracket on the switch, using the J-bolts provided.
See Figure 6. Two
¼
×
1
×
3-inch stiffening
blocks are furnished to be used behind the pole-
band fl anges and underneath the J-bolt nuts.
Fasten the pole band to the back side of the pole
through the hole in the center of the band using
one of the fi ve 1/2 -inch diameter lag screws
provided. Then, fasten the mounting bracket to
the pole using the four remaining 1/2 -inch lag
screws, as shown in Figure 6.