712-502 8
INSTALLATION
Ç
CAUTION
The user-furnished mounting structure
must meet the guidelines for static and
dynamic loading limits listed in S&C
Data Bulletin 712-60.
Failure to observe
these guidelines can result in equip-
ment damage.
Before Starting
If a detailed technical drawing of the user-
furnished mounting structure was supplied
when the switch was ordered, appropriate
mounting holes will be pre-drilled in the base
of each pole-unit. Mounting brackets, channel
sections, or spacers may be supplied with the
Mark VI Circuit-Switcher to facilitate instal-
lation on the existing user-furnished structure.
Refer to the supplied custom erection drawing
for details.
If a detailed technical drawing of the user-
furnished mounting structure was not supplied
when the switch was ordered, the pole-units
will be furnished with the mounting hole pattern
appropriate for Circuit-Switchers installed on
S&C Mounting Pedestals. A standard erection
drawing and reference drawing will be sup-
plied. Refer to this standard erection drawing
for details.
Step 1
Before removing the disconnect pole-units from
the skid, arrange the skid on a level surface, in
the position and order in which they will be
raised onto the mounting structure, as shown
on the associated erection drawing.
Step 2
Unbolt the wooden cross braces that secure the
disconnect pole-units to each other.
DO NOT
unbolt the disconnect pole-units from the base
of the shipping skid at this time. See Figure 1.
Figure 1. Remove all packing materials from the disconnect pole-units.
DO NOT unbolt the disconnects from the skid until lifting slings are
attached.
Skid
Disconnect
pole-units
Skid