712-502
11
INSTALLATION
Step 7
With the interrupter lifted off the ground, check
that the gas-pressure gauge on the underside of
the interrupter is in the “OK” to operate zone.
See Figures 7 and 8.
NOTICE
The gas-pressure gauge needle should
be in the “OK” to operate zone.
If the
gauge is not in this position, stop the
installation and notify S&C Electric
Company.
Figure 7. With the interrupter lifted off the ground, check the gas-pressure
gauge on the underside of each interrupter.
Interrupter indicators
Figure 8. Check that the gas-pressure gauge on each interrupter is in the
“OK” to operate zone.
“OK” to operate