background image

   

S&C Instruction Sheet 1011-510

   

5

Ungrounded Wye Banks

Installation consists of several operations. The details of these operations, and the order 
in which they must be carried out, depend on the type of control device, and on local 
or customer codes, standards, and procedures. The following information is specifi c 
to BankGuard Plus Controls protecting 

ungrounded wye-connected capacitor banks

.

  The required fuse blocks and fuses are furnished with the control device, and you must 
install them. When you design the installation, be sure to provide adequate ventilation; 
the temperature near the control device should not exceed 160°F. This is particularly 
important when the control is installed in a cabinet or when several controls are installed 
close together.

Step 1

  Read and make sure you understand the following warnings before you begin 

installatin or operate this equipment.

Ç

 WARNING

These instructions do NOT replace the need for utility operation standards. Any 
conflict between the information in this document and utility practices should be 
reviewed by appropriate utility personnel and a decision made as to the correct 
procedures to follow.

  Serious risk of personal injury or death may result from contact with electric 
distribution equipment when electrical isolation and grounding procedures are not 
followed. The equipment described in this document must be operated and main-
tained by qualified persons who are thoroughly trained and understand any hazards 
that may be involved. This document is written only for such qualified persons and 
is not a substitute for adequate training and experience in safety procedures for 
accessing high voltage equipment.

  This control is connected to capacitors operating at primary voltage levels. High 
voltage may be present in the wiring to the control or the control itself during cer-
tain failures of the capacitor bank wiring or system grounding, or due to a failure 
of the capacitor bank itself. For this reason, access to the control should be treated 
with the same safety precautions that would be applied when accessing other high 
voltage lines and equipment. Follow all locally approved safety procedures when 
working on or around this control.

  Do not energize the control power source entering the control enclosure until all 
wiring is complete.

Ç

 WARNING

Do not enable communications by connecting radios, fiber optic cables, or dedicated 
phone lines until this is called out in the instructions.

  Before attempting to access an existing installation, check carefully for visible 
or audible signs of electrical or physical malfunction (do this before touching or 
operating the BankGuard Plus Control or any other part of the installation). These 
warning signs include such things as smoke, fire, open fuses, crackling noises, loud 
buzzing, etc. If a malfunction is suspected, treat all components of the installation, 
including the control and associated mounting hardware, as if they were elevated 
to primary (HIGH) voltage.

  You must follow the sequence of installation steps outlined in this instruction sheet 
to insure a safe and successful BankGuard Plus Control installation.

Installation

Содержание BankGuard PLUS

Страница 1: ...tion Checklist 4 In Shop Setup 4 Ungrounded Wye Banks Installation 5 Test the Control 10 Grounded Wye Banks Installation 11 Test the Control 13 Ungrounded Wye Shunt Reactors Installation 14 Test the C...

Страница 2: ...nkGuard Plus Designate a location where you can easily retrieve and refer to this publication Warranty SPECIAL WARRANTY PROVISIONS The standard warranty contained in seller s standard conditions of sa...

Страница 3: ...OTICE identifies important procedures or requirements that can result in product or property damage if instructions are not followed Following Safety Instructions If you do not understand any portion...

Страница 4: ...e problems that can occur uring installation NOTE Although it is possible use the faceplate buttons and LCD for the initial setup of the control using the IntelliLink software makes the process faster...

Страница 5: ...rds that may be involved This document is written only for such qualified persons and is not a substitute for adequate training and experience in safety procedures for accessing high voltage equipment...

Страница 6: ...BankGuard Plus Control includes numbered terminal strips on the back of the enclosure for external control wiring connections See Figure 1 Table 1 and the electrical diagrams at the end of this instru...

Страница 7: ...B1 11 Star voltage TB1 12 Star voltage return TB2 A 2nd Lockout O O O C TB2 B 2nd Lockout O O O C TB2 1 Chassis ground TB2 2 Lockout C C C O TB2 3 Lockout C C C O TB2 4 Lockout O O O C TB2 5 Lockout O...

Страница 8: ...C 30 Volt Ampere Potential Device s to TB1 9 TB1 10 DB2 11 and TB2 12 phase voltage return Step 4 If necessary connect the potential devices or voltage transformers used for unbalance compensation If...

Страница 9: ...e to ground voltage relationships for all but fault conditions The circuits connecting the potential devices voltage transformers to the BankGuard Plus Control must be free of variable loads variable...

Страница 10: ...rmation on the LCD If password protection is enabled press the NEXT button again to start scroll ing through password values If the display is blank see the Troubleshooting Instruction Sheet 1011 550...

Страница 11: ...ap point and ground should equal the number of series groups between the tap point and the line For capacitor banks with an odd number of series groups per phase the number of series groups between th...

Страница 12: ...ircuit of the bank switch operator to TB2 4 and TB2 5 D The closing circuit of the bank switch operator to TB2 2 and TB2 3 E The control device power source 48 250 Vdc 100 240 Vac 50 or 60 Hz as appro...

Страница 13: ...INDICATOR or ALARM INDICATOR LED turns ON press the corresponding RESET button to clear it B Press the ENTER button to test the faceplate LEDs All LEDs should turn ON for 2 seconds C Press the NEXT b...

Страница 14: ...hazards that may be involved This document is written only for such qualified persons and is not a substitute for adequate training and experience in safety procedures for accessing high voltage equi...

Страница 15: ...p 3 Step 3 If necessary connect the potential devices or voltage transformers used for unbalance compensation If the BankGuard Plus Control uses the optional unbalance compensation feature you must al...

Страница 16: ...This insures that the monitored voltages accurately represent the magnitude and phase angle of the bus voltages Some possible errors affecting unbalance compensation are Differences in the effective...

Страница 17: ...INDICATOR or ALARM INDICATOR LED turns ON press the corresponding RESET button to clear it B Press the ENTER button to test the faceplate LEDs All LEDs should turn ON for 2 seconds C Press the NEXT b...

Страница 18: ...BankGuard Plus installation S C Electric Company supports the BankGuard Plus Control with a variety of communi cations hardware options S C SpeedNet Radio UtiliNet Radio Cellnet Radio Microwave Data...

Страница 19: ...S C Instruction Sheet 1011 510 19 Installation and Connection Drawings...

Страница 20: ...20 S C Instruction Sheet 1011 510 Installation and Connection Drawings...

Страница 21: ...S C Instruction Sheet 1011 510 21 Installation and Connection Drawings...

Страница 22: ...22 S C Instruction Sheet 1011 510 Installation and Connection Drawings...

Страница 23: ...S C Instruction Sheet 1011 510 23 Installation and Connection Drawings...

Страница 24: ...Printed in U S A...

Отзывы: