background image

 

S&C Series 2000 Circuit-Switchers

 

Interrupter Replacement

Outdoor Transmission (69 kV through 230 kV)

 

S&C ELECTRIC COMPANY

 

Supersedes Instruction Sheet 716-600 dated 9-13-93

c

 

2002

 

  INSTRUCTION SHEET

 

  

 

716-600

 

Page 1 of 24

February 11, 2002

 

INSTRUCTIONS

 

For Field Replacement

 

Section

Page Number

 

INTRODUCTION

Qualified Persons  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  1
Read this Instruction Sheet . . . . . . . . . . . . . . . . . . . . . . . . . . . .  2
Retain this Instruction Sheet   . . . . . . . . . . . . . . . . . . . . . . . . . .  2
Proper Application  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  2
Warranty   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  2

SAFETY INFORMATION

Understanding Safety-Alert Messages  . . . . . . . . . . . . . . . . . . .  3
Following Safety Instructions   . . . . . . . . . . . . . . . . . . . . . . . . .  3
Replacement Instructions and Labels  . . . . . . . . . . . . . . . . . . .  3

INSPECTION AND PACKING

Inspection  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  4
Packing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  4

 

Section

Page Number

 

BEFORE STARTING INTERRUPTER

REPLACEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  4

INTERRUPTER REPLACEMENT

ON MODELS 2020, 2025, AND 2030 . . . . . . . . . . . . . . . . . . . . . .  5

INTERRUPTER REPLACEMENT

ON MODELS 2010, 2015, and 2040 . . . . . . . . . . . . . . . . . . . . . .  12

INTERRUPTERS WITH THE REMOTE GAS-DENSITY 

MONITOR OPTION

Installing the Transmitter   . . . . . . . . . . . . . . . . . . . . . . . . . . . .  18
Programming the Receiver  . . . . . . . . . . . . . . . . . . . . . . . . . . .  22

INSPECTION SCHEDULE AND PROCEDURES  . . . . . . . . . . . .  24

 

TABLE OF CONTENTS

INTRODUCTION

 

The following instructions are for field replacement of
interrupters for S&C Series 2000 Circuit-Switchers rated
69 kV through 230 kV. 

The Series 2000 Circuit-Switcher interrupter is a porce-

lain-enclosed, hermetically sealed device containing
sulfur-hexafluoride (SF

 

6

 

) gas under pressure. It employs

an operating rod which is driven to the open position at
high speed, by means of a power train connected to the
Series 2000 Circuit-Switcher Operator, to effect circuit
interruption. This operating rod is also driven to the
closed position at high speed to effect circuit closing
within the interrupter.

 

Qualified Persons

Ç

 

 

 

WARNING

 

 

 

The equipment covered by this publication must be
installed, operated, and maintained by qualified per-
sons who are knowledgeable in the installation, oper-
ation, and maintenance of electric power distribution
equipment along with the associated hazards. A quali-
fied person is one who is trained and competent in:

 

 

The skills and techniques necessary to distinguish
exposed live parts from non-live parts of electrical
equipment.

 

 

The skills and techniques necessary to determine
the proper approach distances corresponding to
the voltages to which the qualified person will be
exposed.

 

 

The proper use of the special precautionary tech-
niques, personal protective equipment, insulating
and shielding materials, and insulated tools for
working on or near exposed energized parts of
electrical equipment.

These instructions are intended only for such qual-

ified persons. They are 

 

not 

 

intended to be a substitute

for adequate training and experience in safety proce-
dures for this type of equipment.

Содержание 2000 series

Страница 1: ...e containing sulfur hexafluoride SF6 gas under pressure It employs an operating rod which is driven to the open position at high speed by means of a power train connected to the Series 2000 Circuit Sw...

Страница 2: ...binet of the circuit switcher using the instruction manual holder Proper Application Warranty The standard warranty contained in S C s standard con ditions of sale as set forth in Price Sheet 150 is a...

Страница 3: ...ffice S C Authorized Distributor S C Headquarters or S C Electric Canada Ltd It is important that any missing damaged or faded labels on the equipment be replaced immediately Replacement labels are av...

Страница 4: ...of loss and or damage Packing The Series 2000 Circuit Switcher interrupter is a porce lain enclosed hermetically sealed device containing sulfur hexafluoride SF6 gas under pressure 75 PSI To guard aga...

Страница 5: ...ound the interrupter to be replaced using the following procedure a Remove the two container halves from the shipping crate Note that one of the container halves is fur nished with a loosely attached...

Страница 6: ...r forth as necessary to allow the cable to be threaded through the holes g Pull the cable taut at the indicator end of the inter rupter and attach two of the clamps furnished See Figure 3 right Secure...

Страница 7: ...ith a black yellow striped label and spacer marked with a black yellow striped label to the interrupter using the 18 2 hex head stainless steel screw fur nished These items are included with the repla...

Страница 8: ...d link Pin retaining clip 18 2 hex head stain less steel screw Stop bracket marked with a black yellow striped label 18 2 hex head stain less steel screw Coupling Slot coincides with cross hole Spacer...

Страница 9: ...n box on the insulating support column Use care to avoid damaging the exposed coupling Step 10 Prepare the replacement interrupter for attachment to the insulating support column as follows a Remove a...

Страница 10: ...38 kV Insert the connecting pin retained from Step 10 c into the coupling and operating rod link See Figure 5 top It will be necessary to loosen the 18 2 hex head stainless steel screw indicated in Fi...

Страница 11: ...wo 16 1 and one 16 zinc plated hex head cap screws and flat washers which attach one of the container halves to the indicator end casting of the interrupter Don t remove the remaining 16 cap screw it...

Страница 12: ...ise the container into position around the interrupter d Using a screwdriver as necessary to spread the edges snap the two halves together as shown in Figure 3 Place a 16 zinc plated serrated hex nut...

Страница 13: ...cover to the side of the transition box on the insulating support column See Figure 10 Remove the cover and place it and the hardware on a clean surface They will be re used in Step 31 Step 21 Prepar...

Страница 14: ...rate Step 26 Remove the interrupter lifting bracket and associated inch stainless steel hardware from the end of the replacement interrupter This bracket is not used in the interrupter replacement pro...

Страница 15: ...ing slings to the replacement inter rupter and carefully lift and slide the interrupter into posi tion Use care to avoid damaging the exposed operating rod Thoroughly wire brush the mating surfaces on...

Страница 16: ...draw it approximately inch so that the connect ing pin can be inserted Do not remove the screw at this time Now insert the pin retaining clip retained from Step 28 as indicated in Figure 13 left Make...

Страница 17: ...e provided so that a rope or lifting sling can be attached and the container half more conveniently lowered to the ground d Now remove and discard the 16 hex head cap screw and flat washer which attac...

Страница 18: ...cable Do not remove the shorting plug from the end of the green 6 pin connector at this time See Figure 14 Step 38 On Circuit Switchers with vertical interrupters Model 2020 Model 2025 and Model 2030...

Страница 19: ...he side of the operating rod that is towards the access opening Feeding the sensor cable from behind the operat ing rod may cause the cable to catch on the rod during switch operation See Figure 16 St...

Страница 20: ...nnector located on the red sensor cable Remove the shorting plug from the 6 pin socket on the transmitter circuit board Firmly plug the green 6 pin connector from the inter rupter into the green 6 pin...

Страница 21: ...e replaced Retain the jumper for future use in the pocket on the operator enclosure door NOTICE Save the shorting plugs and install them on the replaced interrupters When replacing an interrupter with...

Страница 22: ...perator door Step 46 Press and hold for 10 seconds the system set up button located on the right side of the receiver See Figure 20 The receiver unit will start to count down See Figure 21 Release the...

Страница 23: ...nce every hour When the magnet tool is applied to transmitter the transmitter is prompted to send a signal to the receiver once every second The transmitter will continue to send this sig nal for up t...

Страница 24: ...esignations are not correct reprogramming of the receiver is required Repeat Steps 41 51 until the pole unit designations are appropriate for the installation NOTICE If the poles are not initialized i...

Отзывы: