Alignment and Adjustments
2-11
Samsung Electronics
2-4 Deck Adjustmant
2-4-1 Operation Without Housing Assembly
1) Remove the Housing Ass’y from the Deck Ass’y.
2) Connect the Mechanical Chassis to the recorder
circuit to supply voltage.
3) Set to Unload mode.
4) Press the S/W Push (Keep ON status)to start load-
ing, and push the PLAY Key.
(Cover the Top/End sensor with black tape,
because they do not operate.)
Note
: For the removal of the Housing Ass’y refer to
4-2-2 (Training Manual ; page 4-8).
Connceted the Recorder Circuit
SWITCH C-IN
Fig. 2-15
2-4-2 Setting Mechanical Mode (Without Recorder Circuit)
1) Set the power-supply output to approx. 3V~5V.
2) Choose the polarity (depending on whether load-
ing or unloading).
3) Supply the voltage to the Motor Loading, and set
to the desired mode.
Fig. 2-16
A
B
DC POWER SUPPLY
<Table 2-5>
A
B
Movement of Chassis
+
-
Unloading
-
+
Loading
Содержание VP-D101
Страница 24: ...2 20 Alignment and Adjustments Samsung Electronics MEMO...
Страница 46: ...Exploded View and Parts List 3 22 Samsung Electronics MEMO...
Страница 52: ...6 Samsung Electronics MEMO...
Страница 66: ...Block Diagram 5 2 Samsung Electronics This Document can not be used without Samsung s authorization MEMO...
Страница 68: ...PCB Diagrams 6 2 Samsung Electronics 6 1 Main PCB COMPONENT SIDE CONDUCTOR SIDE...
Страница 74: ...PCB Diagrams 6 8 Samsung Electronics MEMO...
Страница 98: ...Schematic Diagrams 7 24 Samsung Electronics This Document can not be used without Samsung s authorization MEMO...