Control Systems
164
VI
VI
Building management system
2. DMS B-net (BACnet GW)
5) Wiring
MIM-B17N
C
onnecting with outdoor unit
F1
F2
R1
R2
Outdoor unit
Outdoor unit
Outdoor unit
R1R2
R1R2
R1R2
R1R2
Outdoor unit
Outdoor unit
Outdoor unit
Outdoor unit
Maximum 16
connections
Ú
Outdoor unit's address is defined automatically.
The address can be changed manually also.
0
0
1
1
'
'
C
onnecting with OnOff controller
Outdoor unit
Outdoor unit
Outdoor unit
Maximum 15
OnOff controllers
R1R2
R1R2
BACnet GW
BACnet GW
[¥]UwGG ¥UGGGX][
YWX[TW[TY\GGG㝘䟸G[aZ]a[Z
Содержание MR-DH00
Страница 8: ...DVM CONTROL SYSTEMS 8...
Страница 75: ...75 III Integratedmanagementsystems DMS2 S NET3 76 111 1 2 I NTEGRATED M ANAGEMENT S YSTEMS...
Страница 93: ...I NTEGRATED M ANAGEMENT S YSTEMS 93 MJDL MJDL QQMJDBUJPO DPNQMFUFE Register control logic Control logic applied...
Страница 127: ...127 MFDUSJDJUZ NFUFS JOUFSGBDF NPEVMF 128 1 IV Powerdistributionsystem P OWER D ISTRIBUTION S YSTEM...
Страница 184: ...DVM CONTROL SYSTEMS 184 Uw G G U GGGX_ YWX TW TY GGG G aZ a...
Страница 197: ...197 MEMO Uw G G U GGGX YWX TW TY GGG G aZ a...