Disassembly and Reassembly
Samsung Electronics
1-47
1-4-28 Assembly of Slide Main
1. Install the shaft of Loading ÒRÓ Gear AssÕy into the left of the Main Slide Hole and secure with the
Slit Washer
@
. (Refer to detail ÒAÓ)
2. Insert the Tension Control Lever
#
and the Idler Change Lever
$
into the Main Slide Hole.
(Refer to detail ÒBÓ)
3. After confirming the above items 1, 2 install the Main Slide and secure with tabs (a, b, c).
Note :
Be sure to assemble the Main Slide when the Loading L/R Gear AssÕy is in unloading position.
GEAR LOADING "R"ASS'Y
GEAR LOADING "L "ASS'Y
1
LEVER IDLER CHANGE
SLIDE MAIN
4
LEVER TENSION CONTROL
3
WASHER - SLIT
"a"
"d"
"b"
"C"
"B"
"A"
2
Fig. 1-48 Assembly of Slide Main