Installing vibraiton-isolation frame
f
During installation, make sure there is no gap
between the supporting base and the extra structures
such as vibration-isolation frame or H beam.
f
Supporting base must be constructed strongly to
support the bottom part of the vibration-isolation
mount.
f
After installing the vibration-isolation frame, unscrew
the fixing part on the top and bottom part of the
frame.
Installing discharge duct
f
Static pressure of the discharge duct should be within
the standard specification (78.5 Pa) when installing
the duct.
f
If you remove the fan guard to install the discharge
duct, make sure to install a safety net on the duct
outlet.
Foreign substance may enter into the product and
there could be a risk of personal injury.
f
Wear protection equipment at all times when making
galvanized sheet metal duct, since the worker may
get injured by the sharp parts.
f
When installing the product under the tree or
near forest, leafs may get into the product and
cause problems on the product. Therefore, install
a discharge duct to prevent foreign substance
infiltration.