![Samson TROVIS 5474 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/samson/trovis-5474/trovis-5474_mounting-and-operating-instructions_4048411010.webp)
1.4
Displaying data
Controller time, measured values, set points and limits, times-of-use, public holidays and vaca-
tion periods can be retrieved and displayed in th
e
InF1
to
InF9
info levels (-> Fig. 10 on page
131). The various levels are listed in section 13.3.
4
InF1: Boiler 1
4
InF2: System Anl 1 to 3, Co5 -> Fb13 = ON: Separate heating circuit
System Anl 4 to 7: Boiler 2
4
InF3: System Anl 1 to 3, Co5 -> Fb13 = ON: Direct heating circuit
4
InF4: DHW heating
4
InF5: General information, e.g. times-of-use
4
InF8: Error initialization
4
InF9: Modbus and meter bus communication
Proceed as follows:
Select info level.
Open info level.
Scroll to read the various datapoints of the selected info level that appear one after
the other.
Compare the set point/limit with the actual value.
Press both arrows keys simultaneously:
Return to the display with time.
10
EB 5474 EN
Operation
Содержание TROVIS 5474
Страница 79: ...System Anl 3 System Anl 4 EB 5474 EN 79 Electrical connection...
Страница 80: ...System Anl 5 System Anl 6 80 EB 5474 EN Electrical connection...
Страница 127: ...EB 5474 EN 127 Index Key number 1732...
Страница 129: ...EB 5474 EN 129...
Страница 130: ...130 EB 5474 EN...