
10-2
EB 3009 EN
Decommissioning
To decommission the regulator for service
work or disassembly, proceed as follows:
1. Close the shut-off valve (1) on the up-
stream side of the regulator.
2. Close the shut-off valve (6) on the down-
stream side of the regulator.
3. Completely drain the pipelines and
valve.
4.
Depressurize the plant.
5. If necessary, allow the pipeline and reg-
ulator components to cool down or warm
up to the ambient temperature.
Содержание 42-10
Страница 24: ...3 10 EB 3009 EN...
Страница 54: ...8 4 EB 3009 EN...
Страница 60: ...9 6 EB 3009 EN...
Страница 64: ...11 2 EB 3009 EN...
Страница 66: ...12 2 EB 3009 EN...
Страница 68: ...13 2 EB 3009 EN...
Страница 70: ...14 2 EB 3009 EN Certificates 1...
Страница 71: ...EB 3009 EN 14 3 Certificates...
Страница 72: ...14 4 EB 3009 EN...
Страница 75: ......