EB 3009 EN
5-3
Installation
5.2 Preparation for installation
The regulator is delivered ready for connec-
tion.
Before installation, make sure the following
conditions are met:
−
The regulator is clean.
−
The regulator and all piping are not
damaged.
−
Install a strainer upstream of the regula-
tor.
−
The valve data on the nameplate (type
designation, valve size, material, pres
-
sure rating and temperature range)
match the plant conditions (size and
pressure rating of the pipeline, medium
temperature etc.). See the 'Markings on
the device' section for nameplate details.
− The requested or required additional fit
-
tings (see the 'Design and principle of
operation' section) have been installed or
prepared as necessary before installing
the valve.
Proceed as follows:
Î
Lay out the necessary material and tools
to have them ready during installation
work.
Î
Flush the pipeline
before
installing the
regulator.
The plant operator is responsible for
cleaning the pipelines in the plant.
Î
Check any mounted pressure gauges to
make sure they function properly.
The plant operator is responsible for clean-
ing the pipelines in the plant.
Any impurities carried along by the process
medium may impair the proper functioning
of the regulator. Therefore, we recommend
installing a strainer (e.g. SAMSON
Type 2 NI) upstream of the regulator.
Note
Note
Содержание 42-10
Страница 24: ...3 10 EB 3009 EN...
Страница 54: ...8 4 EB 3009 EN...
Страница 60: ...9 6 EB 3009 EN...
Страница 64: ...11 2 EB 3009 EN...
Страница 66: ...12 2 EB 3009 EN...
Страница 68: ...13 2 EB 3009 EN...
Страница 70: ...14 2 EB 3009 EN Certificates 1...
Страница 71: ...EB 3009 EN 14 3 Certificates...
Страница 72: ...14 4 EB 3009 EN...
Страница 75: ......