EB 3969 EN
27
Measures for preparation
4
Measures for preparation
After receiving the shipment, proceed as fol-
lows:
1. Check the scope of delivery. Compare
the shipment received with the delivery
note.
2. Check the shipment for transportation
damage. Report any transportation dam-
age.
4.1
Unpacking
Risk of solenoid valve damage due to for-
eign particles entering the valve.
Do not remove the packaging and protective
film/protective caps until immediately before
mounting and start-up.
1. Remove the packaging from the solenoid
valve.
2. Dispose of the packaging in accordance
with the valid regulations.
4.2
Transporting
−
Protect the solenoid valve against exter-
nal influences (e.g. impact).
−
Protect the solenoid valve against mois-
ture and dirt.
−
Observe transport temperature depend-
ing on the permissible ambient tempera-
ture (see technical data in section 3.2).
4.3
Storage
Risk of solenoid valve damage due to im-
proper storage.
−
Observe the storage instructions.
−
Avoid long storage times.
−
Contact SAMSON in case of different stor-
age conditions or long storage periods.
Storage instructions
−
Protect the solenoid valve against exter-
nal influences (e.g. impact, shocks, vi
-
bration).
−
Do not damage the corrosion protection
(coating).
−
Protect the solenoid valve against mois-
ture and dirt. In damp spaces, prevent
condensation. If necessary, use a drying
agent or heating.
−
Observe storage temperature depending
on the permissible ambient temperature
(see technical data in section 3.2).
−
Store solenoid valve with the cover
closed.
−
Seal the pneumatic and electrical con-
nections.
NOTICE
!
NOTICE
!
Содержание 3969
Страница 1: ...Translation of original instructions EB 3969 EN Edition June 2018 Type 3969 Solenoid Valve...
Страница 46: ......
Страница 47: ......