Measures for preparation before installation
4 Measures for preparation
before installation
After receiving the shipment, proceed as fol
-
lows:
1. Check the scope of delivery. Compare
the shipment received with the delivery
note.
2. Check the shipment for transportation
damage. Report any damage to
SAMSON and the forwarding agent
(refer to delivery note).
In the delivered state, the regulators are
packed to be free of oil and grease for oxy-
gen service.
Do not open or remove the packaging until
immediately before installation.
4.1 Unpacking
In the delivered state, the regulators are
packed to be free of oil and grease for oxy-
gen service.
Do not remove the packaging until immedi-
ately before installation.
Note
NOTICE
!
Before installing the regulator, proceed as
follows:
1. Remove the packaging from the control
-
ler.
2. Dispose of the packaging in accordance
with the valid regulations.
4.2
Transport, lifting and
storage
Due to the low service weight, lifting equip
-
ment is not required to lift and transport the
regulator (e.g. to install it into the pipeline).
Transport instructions
−
Protect the device against external influ
-
ences (e.g. impact).
−
Do not open or remove the packaging
until immediately before installation.
−
Protect the device against moisture and
dirt.
−
Observe the permissible ambient tem
-
peratures (see section Table 1).