ENGLISH
17
9.5
TOOLS
REQUIRED
A
typical
range
of
tools
that
are
required
for
pump
maintenance
is
listed
below.
Those
tools
are
standard
one
and
should
be
available
in
every
industrial
maintenance
Dpt.
•
Wrenches
to
suit
up
to
M48
nuts,
•
Socket
spanner
up
to
M
48,
•
Allen
keys
up
to
10
mm,
•
Range
of
screwdrivers,
•
Soft
mallet.
If
maintenance
work
must
be
performed
in
an
ATEX
classified
area
then
make
sure
that
use
of
all
necessary
tools
are
authorized
in
the
area.
More
specialized
equipment
:
•
Bearing
pullers,
•
Bearing
induction
heater
for
ball
bearing
assembly,
•
Coupling
grip
spanner.
Additional
equipments
used
for
coupling
alignment
:
•
Calipers,
•
Crowbar,
•
Straightedge,
•
Shims,
•
Sledgehammer.
Содержание NFCH series
Страница 2: ...NFCH INSTALLATION ET MISE EN SERVICE FRAN AIS N M S n 4095251 Ed 3 10 13...
Страница 23: ...FRAN AIS 23 13 DECLARATION CE...
Страница 24: ...NFCH INSTALLATION AND OPERATING INSTRUCTIONS ENGLISH N M S n 4095251 Ed 3 10 13...
Страница 25: ...2...
Страница 45: ...ENGLISH 22 13 EC DECLARATION OF CONFORMITY...