ENGLISH
12
Using
a
straight
‐
edge
and
a
caliper
:
Using
a
dial
gauge
:
When
checking
parallel
alignment,
the
total
indicator
read
‐
out
shown
is
twice
the
value
of
the
actual
shaft
displacement.
Align
in
the
vertical
plane
first,
then
horizontally
by
moving
the
motor.
Lifetime
of
ball
bearing
and
coupling
flexible
part
as
well
as
pumpset
noise
level
will
depend
on
the
alignment
quality.
Coupling
alignment
is
not
necessary
when
a
IEC
adaptation
lantern
is
used.
Both
motor
and
pumps
shaft
are
aligned
by
construction.
7.2
PIPE
WORK
Pump
connection
flanges
are
plugged
to
avoid
any
contamination
during
transport
and
storage.
Protective
covers
should
be
removed
only
before
installing
the
pump
in
the
piping.
Remove
dust
before
removing
the
covers
from
pump
flanges.
Especially
for
new
pipe
work
:
clean
thoroughly
piping
before
connecting
it
to
the
pump.
Remove
protective
covers
Add
flange
gaskets
Fasten
suction
pipe
Fasten
discharge
pipe
No
stress
must
be
applied
to
the
pump
casing
by
the
pipe
work.
If
excessive,
those
forces
and
moments
cause
misalignment,
overheating
of
bearings,
coupling
wear,
vibrations
and
possible
failure
or
explosion
of
pump
casing.
After
replacement
of
a
pump
or
during
connection
of
pipes
to
pump
flanges,
never
use
pump
flanges
as
a
support
to
pull
or
push
the
pipe
works.
The
axial
displacement
of
expansion
coupling
(if
installed)
should
be
limited.
Use
tie
rods
as
recommended
by
the
manufacturer.
Two
designs
are
possible
for
the
suction
line
:
positive
suction
head
and
suction
lift
operation.
Positive
suction
head
operation
:
Nominal
diameter
of
the
pipeline
is
often
larger
diameter
than
pump
suction
flange.
Unequal
nominal
diameter
should
be
compensated
by
an
eccentric
transition
part.
It
is
recommended
to
install
a
straight
pipe
before
the
pump
inlet
(size
L
should
be
2
to
3
times
the
pipe
nominal
dimension).
The
suction
line
should
be
laid
with
a
downward
slope
toward
the
pump.
Discharge
pipe
:
Nominal
diameter
of
discharge
pipe
should
be
chosen
to
ensure
a
max
flow
speed
of
3m/s.
Filter
:
If
required
a
filter
can
be
installed
before
the
pump
intake.
To
ensure
proper
working
of
pump
the
equivalent
exchange
surface
of
the
strainer
should
be
3
time
the
pipe
sectional
area.
Clogging
level
of
filter
should
be
checked
regularly.
Valves
:
It
is
advised
to
install
isolating
valves
on
suction
and
discharge
side
for
maintenance
purpose.
Those
valves
should
be
of
large
passage
type
and
could
be
locked
in
position.
Isolating
valve
on
suction
side
should
not
be
connected
to
pump
suction
flange.
Non
‐
return
valve
:
A
check
valve
can
be
installed
on
discharge
side
to
protect
the
pump
from
back
flow
effects
such
as
pressure
surges
or
back
flow
when
pump
is
stopped.
After
pipe
work
is
done
turn
pump
shaft
by
hand
and
check
it
turns
freely.
If
it
appears
that
it
is
difficult
to
turn
pump
shaft,
then
check
forces
applied
by
piping
to
pump
casing.
Installation
of
piping
should
be
done
again.
External
lubrication
of
mechanical
seal
:
If
suction
lift
operation
is
preferred
it
will
be
necessary
to
check
pressure
on
vent
connection
:
An
external
lubrication
of
the
mechanical
seal
should
be
installed
if
a
negative
pressure
is
noticed.
A
constant
level
oiler
using
pumped
fluid
should
be
connected
to
the
upper
connection
on
bearing
bracket.
The
lower
connection
should
be
plugged
to
avoid
air
intake
and
avoid
dry
running
of
mechanical
seal.
This
piping
system
should
be
used
when
a
negative
head
of
5
mwc
is
noticed
in
the
inflow
line
near
pump
suction
flange.
Connection
of
the
leakage
line
:
NFCH
pumps
are
designed
to
handle
heat
transfer
fluids
at
a
very
high
temperature.
A
pipe
should
be
connected
to
lower
connection
port
on
bearing
bracket
to
drain
oil
leakages
safely
:
Содержание NFCH series
Страница 2: ...NFCH INSTALLATION ET MISE EN SERVICE FRAN AIS N M S n 4095251 Ed 3 10 13...
Страница 23: ...FRAN AIS 23 13 DECLARATION CE...
Страница 24: ...NFCH INSTALLATION AND OPERATING INSTRUCTIONS ENGLISH N M S n 4095251 Ed 3 10 13...
Страница 25: ...2...
Страница 45: ...ENGLISH 22 13 EC DECLARATION OF CONFORMITY...