
-9-
INSTALLATION
The installation must be carried out by a suitably qualified person, in
compliance with gas installation regulations, local electrical and
building rules and specifications, and the instructions outlined in this
manual.
Before cutting into any benchtops, ensure the minimum clearances to walls, adjacent surfaces
and overhead surfaces required by the relevant gas appliance installation code (see above) will
comply. Dimensions are specified in millimetres (mm).
•
Overhead cupboards and range hood = 650mm
•
Side and rear clearance = 200mm to any burner edge.
•
Overhead exhaust/ceiling fan = 750mm
•
Horizontal surfaces adjacent to the hob = less than or equal to the hob height.
•
Ensure there is sufficient clearance to fit the regulator and/or flexible hose connection
with the hotplate in the installed position.
When you have installed the hob, make sure that:
•
The GPO (general purpose outlet) must always be in an accessible position.
•
The supply connection point, test point and natural gas regulator adjustment screw (for
Natural gas installation) are accessible for testing and/or adjustment with the hotplate in
the installed position.