30
Smarty 2X/3X P
www.salda.lt
EKA
TJ
When using the supply air heater, the supply air sensor
(SS) shall be installed downstream the heater (or cool-
er) as the sensor cable allows or until the first branch-
ing, bend of the air transportation system.
DRAWN BY
CHECKED BY
SIGNATURE
DUTIES / NAME
DATE
UAB"SALDA"
Drawing #
Book #
CHECKED BY
1
1
2
3
4
4
5
6
7
7
External heater
SP61 - KE - On/Off (V1.1)
Principle connection scheme
12
07
2016-06-23
2016-06-23
2016-06-23
PE
L
N
KE1
X1
0:
1
- P
E
X1
0:
2
- D
O1
(L
(L
2)
)
X1
0:
3
- N
(L
1)
miniMCB V0.2
X1
0:
1
- P
E
X1
0:
2
- D
O1
(L
(L
2)
)
X1
0:
3
- N
(L
1)
miniMCB V0.2
-K1
1
2
3
4
5
6
-K1
A1
A2
RT
1
RT
1
AT
1
AT
1
PE
L
(L
1)
N
(L
2)
KE1
AT
1
AT
1
RT
1
RT
1
External heater
Control on/off
Power up to 0,6 kW - 1f
External heater
Control on/off
Power over 0,6 kW - 1f (2f)
=miniMCB1
=miniMCB1
X2
3:
1
- D
I1
X2
3:
2
- 1
2V
DC
X2
3:
3
- D
I2
X2
3:
4
- 1
2V
DC
miniEX1 V0.2
X2
3:
1
- D
I1
X2
3:
2
- 1
2V
DC
X2
3:
3
- D
I2
X2
3:
4
- 1
2V
DC
miniEX1 V0.2
PE L1 N
PE (L1) (L2)
SP61
Содержание Smarty 2X P
Страница 36: ...36 Smarty 2X 3X P www salda lt...