26
Smarty 2X/3X P
www.salda.lt
Wiring diagram
Automation controller A (X2) and D (X12) zones.
SP58
KE
(EKA)
+
TA
PE
Ptouch
Stouch
*
TE**
Tinklas
KE*
(EKA)
TA
*
TE**
PE*
(EKA
NIS/
EKA)
KE*
(EKA)
TA
*
TE**
PE*
(EKA
NIS/
EKA)
AKS***
AKS***
AKS***
AKS***
AKS***
AKS***
*
*
*
MB-
Gateway
Ptouch
Stouch
Tinklas
MB-
Gateway
Ptouch
Stouch
Tinklas
MB-
Gateway
Installation diagram
Installation based on air direction Air Damper M2 -> Pre-Heater PE -> Recuperator.
DRAWN BY
CHECKED BY
SIGNATURE
DUTIES / NAME
DATE
UAB"SALDA"
Drawing #
Book #
CHECKED BY
1
1
2
3
4
4
5
6
7
7
External heater
SP58 - PE - 0-10V
Principle connection scheme
12
04
2016-06-23
2016-06-23
2016-06-23
PE
L
N
PE
-K1
1
2
3
4
5
6
-K1
A1
A2
X5
:1
-
DI
5
X5
:2
-
+1
2V
DC
X5
:3
-
DI
6
X5
:4
-
+1
2V
DC
miniMCB V0.2
AT
1
AT
1
RT
1
RT
1
X5
:1
-
DI
5
X5
:2
-
+1
2V
DC
X5
:3
-
DI
6
X5
:4
-
+1
2V
DC
miniMCB V0.2
X2
:5
-
GN
D
X2
:6
-
AO
3(
0-
10
V)
miniMCB V0.2
0-
10
V
GN
D
GN
D
0-
10
V
PE
L
(L
1)
N
(L
2)
PE
AT
1
AT
1
RT
1
RT
1
X2
:5
-
GN
D
X2
:6
-
AO
3(
0-
10
V)
miniMCB V0.2
=miniMCB1
=miniMCB1
External preheater
Control 0-10V
Power up to 2,0 kW - 1f
External preheater
Control 0-10V
Power over 0,6 kW - 1f (2f)
X1
2:
1
- P
E
X1
2:
2
- N
(L
1)
X1
2:
3
- D
O2
(L
(L
2)
)
miniMCB V0.2
X1
2:
1
- P
E
X1
2:
2
- N
(L
1)
X1
2:
3
- D
O2
(L
(L
2)
)
miniMCB V0.2
PE L1 N
PE (L1) (L2)
Air movement direction
Содержание Smarty 2X P
Страница 36: ...36 Smarty 2X 3X P www salda lt...