SAJ SU3KMTLI Скачать руководство пользователя страница 4

1.    NOTES ON THIS MANUAL

This 

 discribes instructions and detailed procedures for installing, 

operating,  maintaining,  and  troubleshooting  of  the  following  SAJ  grid-tie 
inverters:

SU3KMTLI,               SU4KMTLI,                SU5KMTLI 
                     
Please keep this manual all time available in case of emergency.

User Manual

1.2   SYMBOLS USED

2.    PREPARATION

DANGER

DANGER indicates a hazardous situation which, if not 
avoided,   will result in death or serious injury.

CAUTION indicates a hazardous condition which, if not 
avoided, can result in minor or moderate injury.

CAUTION

NOTICE indicates a situation that can result in potential 
damage, if not avoided.

NOTICE

WARNING

avoided, can result in death or serious injury or moderate 
injury.

WARNING indicates a hazardous situation which, if not 

User

 

Manual

1

User

 

Manual

2

    Sununo– TL5K

          Sununo– TL2K,

Sununo– TL1.5K, 

Sununo– TL3KB, 

Sununo– TL4KB, 

Sununo– TL3KA, 

Sununo– TL4KA,

1.3 TARGET GROUP 

Solar  energy  generation  systems,  based  on  photovoltaic  modules,  nowadays 
represent  the  most  suitable  solution  to  reduce  the  energy  consumption 
produced by oil and gas.

The  solar  inverter  is  a  key  device  in  a  solar  energy  system.  It  performs  the 
conversion of the variable DC output of the PV modules into a clean sinusoidal 
50Hz/60Hz  AC  current  that  is  then  directly  applied  to  the  commercial 
electrical grid or to a local grid electrical network.  

Typically,  solar  inverter  includes  communication  function  to  monitor 
operating  condition,  firmware  to  update  and  control  the  grid  connection. 
Depending  on  the  grid  infrastructure,  cabled  (RS-485,  CAN,  Power  Line 
Communication,  Ethernet)  or  cableless  (Bluetooth,  ZigBee/IEEE802.15.4) 
networking options can be used.

2.1  SYSTEM DEMONSTRATION

Figure 2.1

Solar
Panels

Purchase

Solar
inverter

Grid

Sell

Only  qualified  electricians  who  have  read  and  fully  understood  all  safety 
regulation  contained  in  this  manual  can  install,  maintain  and  repair  the 
inverter. Operators must be aware of the high-voltage device. 

1.1  SCOPE OF VALIDATION

Содержание SU3KMTLI

Страница 1: ...663 Tel 86 20 6660 8532 Fax 86 20 6660 8589 E mail info sajelec com Web www saj solar com User Manual Note Since Guangzhou Sanjing Electric Co Ltd has a policy of continuous product improvement it res...

Страница 2: ...maintenance troubleshooting and safety notice As long as you follow the instruction of this manual you will get the professional guidance and our wholehearted service Customer orientation is our fore...

Страница 3: ...8 Pollution Degree 5 9 Overvoltage Category This Manual 6 Electrical Connection 6 1 Safety 6 2 Overview of Connection Area 6 3 AC Side Connection 6 4 DC Side Connection 6 5 DC Side Disconnection 6 6...

Страница 4: ...ROUP Solar energy generation systems based on photovoltaic modules nowadays represent the most suitable solution to reduce the energy consumption produced by oil and gas The solar inverter is a key de...

Страница 5: ...must be performed by qualified personnel only in compliance with national and local standards and regulations Any unauthorized actions including modification of product functionality of any form may...

Страница 6: ...sformer This inverter does not use transformer for the isolation function Certified safety The inverter complies with the requirement of the Equipment and Product Safety Act in Europe CE Mark Equipmen...

Страница 7: ...stortion THD Consumption at Night W Consumption at Standby W Efficiency Max Efficiency Euro Efficiency at 360Vdc MPPT Accuracy Protection Internal Overvoltage Protection DC Insulation Monitoring DC Si...

Страница 8: ...Range V MPPT Voltage Range V Full Load DC Nominal Voltage V Start Voltage V Min DC Voltage V Max DC Current Input A Number of DC Connection Sets Number of MPP Trackers DC Switch Output AC Rated AC Pow...

Страница 9: ...Max AC Current A Norminal AC Voltage Range Grid Frequency Range Power Factor cos AC Current Distortion THD Consumption at Night W Consumption at Standby W Efficiency Max Efficiency Euro Efficiency at...

Страница 10: ...The installation site must have good ventilation condition Installing the inverter under strong sunshine is not recommended the excess heating might lead to power reduction Make sure enough ventilati...

Страница 11: ...h 3 Mount the rear panel Wring six screws into the expansion tubes and tightly mount the rear panel on the wall Figure 5 5 4 Carefully attach the inverter to the rear panel according to the position o...

Страница 12: ...e removed please keep them at a distance Lift the lid upwards and remove it 2 There are 2 varistors for and 4 varistors for Sununo TL in the left side Sununo TL1 5K 2K 3KB 4KB 3KA 4KA 5K SU3KMTLI SU4K...

Страница 13: ...POLLUTION DEGREE SAJ grid tie solar inverters comply with the pollution degree 3 5 9 OVERVOLTAGE CATEGORY Overvoltage category III applies to SAJ grid tie solar inverter AC terminals For PV circuits i...

Страница 14: ...g communication module AC output Heat sink Ethernet optional Figure 6 1 A B C D E F Sununo TL3KA 4KA 5K SU3KMTLI SU4KMTLI SU5KMTLI Bottom 6 3 AC SIDE CONNECTION NOTICE The cross section of the AC cabl...

Страница 15: ...B is allowed on the supply side of this product Provided an AC current or pulse current is caused in the external protective earthing conductor an RCD or RCM of Type AC or Type A as alternative can be...

Страница 16: ...tention to the polarity of the terminals to avoid wrong connecting 6 4 DC SIDE CONNECTION The cable length on DC side should not exceed 30 m Figure 6 6 Figure 6 7 To do this the insulated earthing con...

Страница 17: ...g plug to seal the left DC input set to ensure the inverter IP 65 protection If only one string input is used for DC connection NOTICE DANGER to life due to potential fire or electricity shock Never c...

Страница 18: ...d cable into contact barrel and insure all conductor strands are captured in the contact barrel and the conductors are visible in the contact barrel observation hole See below figures 3 Crimp contact...

Страница 19: ...rs For more detail information please refer to SAJ Monitoring Solution through www saj soalr com Note The text lines in the following Figures indicates communication cable 6 6 1Communication through R...

Страница 20: ...6 2 Communication through Ethernet RJ45 When users choose Ethernet communication solution users can access to Inverter real time information through Inverter IP address or through SAJ Logger IP addres...

Страница 21: ...y Order Figure 6 25 RJ45 Plug and Its Pin Number Tools When making a communication cable the professional tools shown in Figure6 26 below are needed Figure 6 26 Tools for making a communicate cable RS...

Страница 22: ...ameters The two buttons can be reused Description Name Operation ENT NOTE The back light of LCD screen will go out to save power if there is no button operation in one minute You can activate it by pr...

Страница 23: ...UP DOWN E Today E Month E Year E Total E Today E Total UP DOWN Enter Enter Error Code 02 Grid Volt Err S Enter 12 08 26 17 52 12 08 07 10 05 Enter Language Date UP DOWN SN Code Product Code Firmware V...

Страница 24: ...operation The inverter in stand by state The inverter stops working A fault occurs during operation A fault occurs repeatedly and has reached a certain times during operation P fault The state of upd...

Страница 25: ...confirm and then it automatically points to next figure When all the figures have been set Are you sure to set it will appear press ENT to confirm it Press ESC or ENT to exit when Set Complete appear...

Страница 26: ...of master control unit slave control unit display board the firmware version will vary when it is updated SN code Product Code Machine Type Grid Compliance Firmware Ver 45 9 TROUBLESHOOTING Clear Ener...

Страница 27: ...User Manual User Manual 48 47...

Страница 28: ...User Manual 49 User Manual 50...

Страница 29: ...User Manual 51 User Manual 52...

Страница 30: ...n Road Guangzhou Science City Guangdong China P R C Zip 510663 http www saj solar com Technical Support Service Tel 86 20 6660 8619 Fax 86 20 6660 8589 E mail service sajelec com International Sales T...

Страница 31: ...de Voltage at the Maximum Power Point Amperage at Maximum Power Point Open Circuit Voltage Short Circuit Current Alternating Current Form of electricity supplied by Utility Company Direct Current Form...

Отзывы: