- 51 -
Please choose to use single phase or three phase meters based on
the Grid and PV system types. Cannot use single phase and three
phase meters at a same time.
4.7.2.1 Three Phase Grid & Three Phase PV System
In a three phase grid & three phase PV system, two units of three-
phase meters can be used to sample voltage and current at PV side
and grid side separately.
Please install the two units of 3-phase meters with reference diagram
as showed in Fig. 4.15.
After installation, please set the meter (Grid side) address into 1 and
set the meter address (PV side) address into 2. (Please refer to
section 4.8.2 for setting methods.)
Usually the default address of meter (Grid side) is 1
.
Note: Cable color code may vary from country to country.
Содержание AS1-3KS-5.1
Страница 1: ...1...
Страница 4: ...3 WARRANTY CARD 78...
Страница 32: ...31 Fig 3 14 Hang B1 AS1 together to the mounting brackets...
Страница 50: ...49 Fig 4 13 CT installation...
Страница 72: ...71 agents as it may damage the components...
Страница 76: ...75 Curve for a Volt Watt response mode AS4777 Series Curve for a Volt Var control mode AS4777 Series...
Страница 82: ...81...