20
10. Boiler Casing Continued
STEP 1
Install top and bottom brackets on fron and back tie-rods as shown below.
STEP 2
Wrap boiler block with insulation material and strap it as shown.
STEP 3
Install side rails to each top and bottom brackett from front to back. Attach with
supplied screws
** MAKE SURE SHELF OF BRACKETS
FACE IN TOWARDS EACH OTHER ON
ALL 4 BRACKETS