Proc Sheet 1 26
myC5-2v, myC5-2m
5HPRYHDQG3ODFH
)/$3ORZHUKRXVLQJ
1/2
7KLVRSHUDWLRQPXVWEHPDGHDIWHUOLFHQVH6$*(0
7RROV
- Tweezers.
- Metal dome positioning fixture PN
1%66(
6$*(0
3UHOLPLQDU\RSHUDWLRQ
1. Remove the battery (
Proc Sheet 0 01
).
2. Remove mobile lower housing (
Proc Sheet 1 01
).
3. Remove equipped electronic board (
Proc sheet 1 18
).
4. Remove the keypad (
Proc sheet 1 04
).
5. Remove mobile upper housing (
Proc sheet 1 13
).
6. Remove FLAP upper housing (
Proc sheet 1 32
).
7. Remove the two in one receiver (
Proc Sheet 2 05
).
8. Remove the vibrator (
Proc sheet 2 06
).
9. Remove the Module LCD (
Proc Sheet 2 07
).
5HPRYDOSURFHGXUH
1. Remove the hinge of the lower casing of the FLAP ( 1 ).
2. Remove the foam of the upper casing of the FLAP ( 2 ).
3ODFHPHQWSURFHGXUH
1. Place the hinge on the lower casing of the FLAP ( 1 ).
2. Place the foam on the upper casing of the FLAP ( 2 ).
)XUWKHURSHUDWLRQ
1. Place the module LCD (
Proc Sheet 2 07
).
2. Place the vibrator (
Proc Sheet 2 06
).
3. Place the two in one receiver (
Proc Sheet 2 05
).
4. Place FLAP upper housing (
Proc Sheet 1 32
)
5. Place mobile upper housing (
Proc Sheet 1 13
).
6. Place the keypad (
Proc Sheet 1 04
).
7. Place equipped electronic board (
Proc Sheet 1 18
).
8. Place mobile lower housing (
Proc Sheet 1 01
).
9. Place the battery (
Proc Sheet 0 01
).
Risk of the procédure :
•
Stripe the lower and upper housing of the FLAP.
Obligation of the procedure :
•
&KDQJHERWKWZRLQRQHUHFHLYHUDQG)3&ZKHQ
FKDQJLQJRIWKH)/$3ORZHUKRXVLQJ
Procedure
Symptom
Test
REF MTB DTS 1- Indice A - December 16 2005
Page 5-22