Proc Sheet 1 13
myC5-2v, myC5-2m
5HPRYHDQG3ODFH
0RELOHXSSHUKRXVLQJ
1/2
7RROV
-
Gloves.
-
Equipment to remove the hinge PN
Tools of desolidarisation FLAP.
-
Metal dome positioning fixture PN
1%66(
6$*(0
3UHOLPLQDU\RSHUDWLRQ
1. Remove the battery (
Proc Sheet 0 01
).
2. Remove mobile lower housing (
Proc Sheet 1 01
).
3. Remove the volume control key (
Proc Sheet 1 22
).
4. Remove equipped electronic board (
Proc Sheet 1 18
).
5. Remove the keypad (
Proc sheet 1 04
).
5HPRYDOSURFHGXUH
1. Use the FLAP disassembly to press the hinge ( 1 ) to separate the FLAP from the mobile upper housing
( 2 ).
2. Take off the FPC ( 3 ).
3ODFHPHQWSURFpGXUH
1. Insert the FPC in mobile upper housing ( 3 ).
2. Position the FLAP on the new mobile upper housing ( 4 ).
3. Press the hinge ( 5 ) to put the FLAP in the upper housing of mobile.
)XUWKHURSHUDWLRQ
1. Place the keypad (
Proc Sheet 1 04
).
2. Place equipped electronic board (
Proc Sheet 1 18
).
3. Place the volume control key (
Proc sheet 1 22
).
4. Place mobile lower housing (
Proc Sheet 1 01
).
5. Place the battery (
Proc sheet 0 01
).
Risk of the procedure :
•
Damage the FPC.
•
Damage mobile upper housing.
•
Damage the FLAP.
Procedure
Symptom
Test
REF MTB DTS 1- Indice A - December 16 2005
Page 5-14