9
PINBRAZING
OPERATION
1. When finished grinding for placement of the grounding cable, place the grounding cable on
the cleaned surface.
2. Select brazing pins and ceramic rings to match the specifications of the bonding cable you
selected.
3. Check that the pin holder and ring holder on the gun are the correct sizes for the brazing pins
and ceramic rings you selected. If the sizes are incorrect, the pin holder and ring holder can be
changed, se periodically maintenance of S4 gun on page 12.
4. Insert the brazing pin into the pin
holder. The rounded tip should be
facing away from the gun.
5. Insert the ceramic ring into the ring
holder. The serrated edge should be
facing away from the gun.
The S4 automatically adjusts the correct distance
of the brazing pin to the surface to be brazed.
NOTE: The S4 may be adjusted manually if necessary
using the dial located on the back of the gun.
The settings are as follows:
+ = 2.5 mm distance
0 = 2.0 mm distance (normal position)
- = 1.5 mm distance
Se periodically maintenance of S4 gun on page 12.
6. Turn on the unit by setting the PIN TYPE switch on the control box for the appropriate pin
type being used.
Brazing Pin Setting
8
mm
Std.
P1
8 mm Extra,M8, M10 and M12.
P2
9.5
mm. P3
6. Position the terminal lug of the bonding cable against the
cleaned surface.
Position the gun against the cable lug so that the brazing pin is
at the top edge of the cable lug hole when brazing to a vertical
surface and in the center of the cable lug hole when brazing on
a horizontal surface.