Appendix III.
Monitoring the Airone R Range
This fume cupboard is a ‘portable appliance’, powered by mains electricity and it complies
with EN-BS-61010. The correct fuse must be fitted to the mains plug and this and other parts
of the electrical system should be examined frequently for obvious damage. There should be
regular formal inspections including earth bonding and insulation testing. Only suitably
trained electricians should carry out this testing. Live electrical components could be
exposed.
The minimum requirement to comply with COSHH Regulations is that the face velocities and
filter efficiencies must be yearly monitored (at least once every 14 months) and a written
record kept of the results. There are tables printed on back-pages of the Operational Safety
Log-Book suitable for keeping these records.
SAFELAB SYSTEMS recommend that a simple air-sampling test be carried out once a week at
eye-and-mouth level and/or at the outflow port of the AIRONE Fume Cupboard - utilising an
appropriate GASTEC Chemical Detector Tube - recording any result in the Operational Safety
Log-Book.
It is also recommended that the prefilter be replaced at last once every 6 months. The 6
months span represents a more suitable period between filter-monitoring checks.
SAFELAB SYSTEMS offer Service Contracts for regular filter-monitoring and servicing of all
AIRONE Filtration Fume Cupboards. Please phone our Service Department for details.
Do-It-Yourself Filter Monitoring Checks:
Equipment Required:
Airflow Meter:
A rotating vane anemometer with a vane diameter between 60 to 100mm., with the facility to
average readings over a period of 10 seconds. Safelab Systems supply a suitable rotating
vane anemometer: Order Code - SRVANE.
Unidirectional Hot Wire Anemometers are also available with the facility of averaging
readings.
Содержание AIRONE 1000R
Страница 5: ...Doc no M18 Issue no 07 Created 24 08 2009 5 Airone R airlfow ...
Страница 19: ...Doc no M18 Issue no 07 Created 24 08 2009 19 Appendix VI Main Block Wiring Diagram ...
Страница 20: ...Doc no M18 Issue no 07 Created 24 08 2009 20 Appendix VII Control System ...
Страница 22: ...Doc no M18 Issue no 07 Created 24 08 2009 22 Appendix VIII Siting Locations for Airone R Range Figure 16 ...
Страница 23: ......