Inglese
26
- Once the loading is completed replace the
counter-weight. (fig.59).
- Take care the spoons have no burrs, are not
bent and are all placed horizontally.
6.6.5
Coffee-grounds bag
insertion
- Take the coffee dregs chute off its housing.
- Apply the bag locking spring onto the chute.
- Insert the plastic bag wrapping it around the
chute and securing it with the spring (fig.60).
- Re-insert the chute in the guide.
Use plastic bags that are sufficiently long so as to
touch the bottom of the distributor.
fig. 59
fig. 60
Содержание GROUP 700
Страница 1: ...Vending machine model Saeco Group 700 INSTALLATION AND MAINTENANCE MANUAL E single and double boiler ...
Страница 52: ...Inglese 52 ...
Страница 53: ...53 Inglese Notes ...
Страница 54: ...Inglese 54 Notes ...
Страница 55: ...55 Inglese Notes ...
Страница 56: ...Cod 0871 956 ...