English
22
40
41
• Remove the cabinet from the box, taking out all parts packed inside it.
• Insert the drip funnel (40) into the surface of the cabinet and connect it to the drain tube
(41) (Fig. 6).
• Insert the end of the drain tube into the drain tank.
WARNING:
Strong magnetic fields as well as electrical equipment genera-
ting strong noises and located nearby the machine might cause trouble to
the electronic control.
8 - INSTALLATION
Fig. 6
8.1
Preliminary operations
Fig. 7
Fig. 8
• Make sure the machine is delivered in its original box, closed by straps to avoid
tampering during transport.
Remove the machine from its original box ; keep the box for future use. Comply with
current local environmental codes if the box is discarded. Place the machine on top of
the cabinet. To meet ventilation requirements, it is advisable to position the equipment
so that there is a minimum distance of 8 cm between the back of the machine and the
wall.
• Insert the suction tube contained in the cabinet into the connection fitted under the
equipment (Fig. 7).
• Fill the 20 l tank with fresh, cold water, then insert the tube into the tank plug.
• Remove the plug in the drip tray by carefully punching the plug out (Fig. 8) ; make sure
the hole is aligned with the drip funnel.
8.2
Water connection (for machine directly connected to cold water line only)
Fig. 9
Connect the machine to a water main, whose pressure is between 1.5 and 8 bar. Use a
suitable filling tube and connect it to the G 3/4" coupling fitted on the rear panel of the
machine (Fig. 9).
• Place dump box extension (8) over hole cutout on the bottom of the equipment. Angular
side should face brew group (Fig. 10).
• Fit the coin conveyor (18) into the recess and fasten it with supplied screws, washers
and nuts (Fig. 10).
G 26 Model
Fig. 10 G 13 Model
Fig. 10
The equipment is supplied with
the specific conveyor suitable to
the coiner.
☞
0
1