background image

12 

 

   

 

 

IMAGE 3 

 

 

 

 

 

IMAGE 4 

 

Image 3

 shows the first layer of concrete weights installed. 

Image 4

 shows how to properly stack the last 

two layers of concrete weights, using all 24 blocks. Close all gaps between the top layers, ensure they 
are all touching and pressed firmly together before tightening the weight straps.   

 

 

IMAGE 5 

 

Tighten both straps as shown in Image 5 across the top of both rows of weights. Loop the strap through 
its buckle and pull firmly securing each top row of weights. 
 
 

CAUTION

: The restraining harnesses must be correctly installed. Failure to correctly attach the 

restraining harness to frame may result in the weights shifting during use.   
 
 
7. Place housing on frame. Ensure the housing fits square and flush to the frame.  If necessary, re-adjust 
the concrete blocks to address any interference with the housing cover. 
 
8. Remove the two lock nuts and washers from mast mounting hub on base assembly (as shown below). 
 
9. Position mast assembly through housing and attach to studs located on base assembly with lock nuts 
and washers. Fully tighten with 3/4” or 19mm socket wrench.  

   

 

Содержание PAL2 Series

Страница 1: ...QUATIC LIFT SERIES CEC COMPLIANT MODELS OWNER S MANUAL and MAINTENANCE PROCEDURES S R SMITH LLC CORPORATE HEADQUARTERS P O Box 400 1017 S W Berg Parkway Canby Oregon 97013 USA Phone 800 824 4387 Fax 5...

Страница 2: ...equired to be in the water ready to receive the User The seatbelt must be attached to the seat and fully fastened and used during each transfer Our goal is to provide our customers with the most advan...

Страница 3: ...S INSTRUCTIONS AND THE OWNER S MANUAL MAY RESULT IN SEROUS INJURY OR DEATH Model Product No ______ Product Name ___________ S R Smith LLC PO Box 400 1017 SW Berg Parkway Canby Oregon 97013 USA Phone 5...

Страница 4: ...e lift shall submerge the seat a minimum of 18 457mm below the stationary water level Compliance with ADA is the responsibility of the pool owner Visit www ada gov for complete guidelines DECK PROFILE...

Страница 5: ...all be used on rigid level pool deck surfaces not to exceed a slope of 2 WARNING The PAL2 lift is designed to transfer users from the deck surrounding the swimming pool into the water and back again I...

Страница 6: ...rs show battery charge levels The LED s will illuminate when either the touchpad control or the hand control is activated and will stay lit for 10 seconds At greater than 50 the LED glows Green at les...

Страница 7: ...e formatted The information from the USB can be downloaded to a PC for review and or copied to a spread sheet The performance log will retain approximately 7 600 events Once the file is full it will r...

Страница 8: ...ttery pack in place so that the latch is fully captured by the mounting plate and the battery pack drops fully seated onto the Control Box Image courtesy of Deltran Battery Tender The battery pack sho...

Страница 9: ...returned to service The battery can and should be left on the charger when not in use Batteries have a normal lifespan of between 2 3 years depending on use and care A fully charged battery will provi...

Страница 10: ...t Arm Connects the seat to the horizontal support arms Seating System The seat is manufactured from roto molded plastic with a stainless steel frame The seat comes standard with a seatbelt The seatbel...

Страница 11: ...rs 6 Counter Weights and Weight restraint belts The concrete weights for the lift are located in the bottom of the pallet Using the claw hammer remove the wood restraints to gain access to the blocks...

Страница 12: ...firmly securing each top row of weights CAUTION The restraining harnesses must be correctly installed Failure to correctly attach the restraining harness to frame may result in the weights shifting d...

Страница 13: ...low attach actuator end to end of actuator arm using the 3 8 10mm bolt and nut Fully tighten bolt and nut using 9 16 14mm socket and wrench 11 The accessory carton contains the control box Remove the...

Страница 14: ...ox Make sure the plug is secure and completely seated Allow the 24V motor cable to hang freely and untangled from the first pre installed clip 16 Remove the hand control from the accessory carton Inse...

Страница 15: ...ake sure there are no tangles Then plug the 24V Motor into place 20 Check up and down controls for proper operation both touch pad and hand controls 21 Check left and right controls for proper operati...

Страница 16: ...l disabilities these issues must be taken into account to determine the number of persons required to complete the transfer onto the seat and the number of persons required to be in the water ready to...

Страница 17: ...ilure to fully extend both stabilizing arms and to lock both rear wheels could cause lift movement during transfer and could result in injury Both stabilizing arms must be fully extended and both rear...

Страница 18: ...t to original transfer position Raise or lower seat to proper transfer height Unfasten Seat Belt Transfer off of seat WARNING The PAL2 lift is designed to transfer users from the deck surrounding the...

Страница 19: ...dule must be performed to insure proper operation with the Daily items performed before each use Maintenance Performed Daily Weekly Monthly Check battery level before each use Charge battery daily Wip...

Страница 20: ...Contact your Authorized Reseller or S R Smith for component replacement information Does lift raise or lower No 1 Check battery charge level 2 Check battery connection 3 Use another fully charged bat...

Страница 21: ...de one photo or more of the damaged area 2 Write down or take a photos of the serial sticker from the product S R Smith provides a serial for every pool lift we produce The sticker with the serial num...

Страница 22: ...inch sec 1 49cm sec 3 Motor Rotation 24VDC 13 RPM Gearing Ratio 9 1 4 Battery Power 24V DC IPX3 Gel Lead Acid Temperature Range 41 F 5 C to 104 F 40 C 5 Range of Motion Lifting Variable to configure t...

Страница 23: ...y Seat Assembly 10 160 2700A Gray Foot Rest w Hardware 11 202 2000 PAL2 Main Frame Assembly 12 200 2000 Rigid Caster 13 200 3000 Swivel Caster 14 220 3100 Concrete Block PAL2 15 202 6000 PAL2 Housing...

Отзывы: