Installation
22
Q-750d Ultra Series Installation/Operation Manual
PRE
L
IMINAR
Y
4.
Remove the foam plug from the lens cavity.
Installing the Lens
5.
Carefully remove the lens and other installation hardware (in a small plastic bag) from
the shipping container.
6.
Remove the rear cap from the lens. This protective cap is only used during shipping to
protect the lens from damage.
7.
Remove the front cap from the lens.
8.
Install the spring clip (provided with the lens) on the vertical lens shift adjuster retaining
slot, as shown. The clip reduces backlash in the vertical offset mechanism to keep it
from inadvertently moving after adjustment.
9.
Insert the lens, with the small white label facing up, into the lens cavity. Ensure that the
notch on the vertical lens shift adjuster mates with the retaining slot on the projector,
as shown below. Otherwise, the adjuster won’t work correctly.
➤
Label
Faces
Up
Содержание Quantum Color Q-750d Series
Страница 2: ......
Страница 10: ...x Q 750d Ultra Series Installation Operation Manual P R E L I M I N A R Y Notes ...
Страница 14: ...Table of Contents xiv Q 750d Ultra Series Installation Operation Manual P R E L I M I N A R Y Notes ...
Страница 100: ...Operation 84 Q 750d Ultra Series Installation Operation Manual P R E L I M I N A R Y Notes ...
Страница 124: ...External Control 108 Q 750d Ultra Series Installation Operation Manual P R E L I M I N A R Y Notes ...
Страница 133: ......
Страница 134: ...Runco International 800 23RUNCO Fax 503 748 8161 www runco com 020 1159 00 Rev B November 2011 ...