·
Be sure that the cabinet provides an earthing terminal for the switch to be grounded.
Be sure that the front and back doors of the cabinet have porosities greater than 50% for good ventilation and heat dissipation.
3.4 Installation Tools
Common Tools
Cross screwdriver, straight screwdriver, related electric and optical cables
Bolts, diagonal pliers, straps
Special Tools
Anti-static glove, stripping pliers, crimping pliers, crimping pliers for the crystal head,
wire cutter
Fiber Optic Cleaning Tools
Air-laid paper, optical fiber microscope
Meter
Multimeter, bit error rate tester (BERT), optical power meter
The tool kit is customer supplied.
3.5 Fiber Connection
Before connecting fiber cables, make sure the model of the optical transceiver and fiber type match the optical port. The transmit port
on the local device should be connected to the receive port on the peer device and vice versa.
3.6 Unpacking
Goods Checklist
Chassis Carton
Device panels are installed and operational.
Fans, screwdriver, anti-static wrist strap, yellow/green grounding wires, quick installation
guide, packing list
Module Carton
Modules, packing list, documentation
A normal delivery should contain the above mentioned items, which may differ from the actual delivery, depending on purchase
contracts. Please check your goods carefully against the packing list or purchase contract. If you have any questions or there are
any errors, please contact your distributor.
Содержание RG-S8600E Series
Страница 1: ...RG S8600E Series Switches Quick Installation Guide V1 02...
Страница 5: ...Figure 2 3 Moving the RG S8610E Switch Figure 2 4 Moving the RG S8612E Switch...
Страница 7: ...Figure 3 2 ESD Prevention on RG S8607E Figure 3 3 ESD Prevention on RG S8610E...
Страница 8: ...Figure 3 4 ESD Prevention on RG S8612E...
Страница 18: ...3 RG S8610E bracket installed before delivery Figure 4 11 Installing Bracket to Front Chassis Side...