·
3.2 Installation Site
RG-S8600E series must be used in the room. To ensure normal operation and a prolonged use life of the device, the installation site
must meet the requirements of weight capacity, humidity , cleanness, EMI consideration, grounding system, power, and ventilation.
See the
Preparation before Installation
chapter of
RG-S8600E Series Switches Hardware Installation and Reference Guide
for details.
3.3 Cabinet Mounting
Make sure the cabinet complies with the following conditions:
Install the switch in a 19-inch cabinet in 4-port form hold.
Be sure the distance between two square hole strips, one on each side, is 465 mm.
Figure 3-4 19-inch Cabinet
Содержание RG-S8600E Series
Страница 1: ...RG S8600E Series Switches Quick Installation Guide V1 02...
Страница 5: ...Figure 2 3 Moving the RG S8610E Switch Figure 2 4 Moving the RG S8612E Switch...
Страница 7: ...Figure 3 2 ESD Prevention on RG S8607E Figure 3 3 ESD Prevention on RG S8610E...
Страница 8: ...Figure 3 4 ESD Prevention on RG S8612E...
Страница 18: ...3 RG S8610E bracket installed before delivery Figure 4 11 Installing Bracket to Front Chassis Side...