Stock#: 1657447 (036226)
21
Lower the hoist by pressing and holding the “DOWN” pushbutton on the control station.
This will activate the pump and start the hoist down. Releasing the pushbutton will stop
lowering the hoist and it will hold its position.
NOTE:
When the hoist reaches its “DOWN” limit, the pump will bypass. Care should be
taken not to let the pump bypass for long periods of time, as this will put stress on the
whole hydraulic and electrical system. To stop the pump from bypassing, release the
“DOWN” button on the control station.
Содержание MONARCH
Страница 2: ...Stock 1657447 036226 2 Contents Warnings 3 4 Descriptions 5 7 Installation 8 18 Operation 19 21 ...
Страница 9: ...Stock 1657447 036226 9 ...
Страница 10: ...Stock 1657447 036226 10 ...
Страница 11: ...Stock 1657447 036226 11 ...
Страница 12: ...Stock 1657447 036226 12 ...
Страница 13: ...Stock 1657447 036226 13 ...
Страница 14: ...Stock 1657447 036226 14 ...
Страница 16: ...Stock 1657447 036226 16 FIGURES 2a 3a SINGLE ACTING SCHEMATICS If 2 wire coil ground wire ...
Страница 17: ...Stock 1657447 036226 17 FIGURE 2b 3b DOUBLE ACTING SCHEMATICS If 2 wire coil ground wire ...