![ruegg JUPITER 510 HK Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/ruegg/jupiter-510-hk/jupiter-510-hk_installation-manual_1499073025.webp)
SMART-LINE
ECO-LINE
Installation Guide
25
The fuel pipe connection to the ceramic flue is to be
made flue-gas-tight using pluggable steel pipes. The
connection of the pipes to the ceramic flue is to be
made preferably by means of a prefabricated fireclay
connection stone.
Note: the transition steel pipe/fireclay must be sepa-
rated (expansion) and sealed. Thermal insulation of
connection pipes is not required.
Содержание JUPITER 510 HK
Страница 1: ...SMART LINE ECO LINE INSTALLATION GUIDE...
Страница 2: ......
Страница 26: ...SMART LINE ECO LINE Installation Guide 26 8 Mars 570 K with ceramic flue example with KMS system...
Страница 34: ...SMART LINE ECO LINE Installation Guide 34 Notes...
Страница 35: ...SMART LINE ECO LINE Installation Guide 35...
Страница 36: ...www ruegg cheminee com 89 90 00454 ma_smart line_en_rev2_07 2013...