![ruegg JUPITER 510 HK Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/ruegg/jupiter-510-hk/jupiter-510-hk_installation-manual_1499073018.webp)
SMART-LINE
ECO-LINE
Installation Guide
18
6. Fire insert assembly
6.1. Function check/preparation
The transport securing screw labelled in red (1)
must be removed from the pane flue devices.
Prior to assembly of the appliance, check the individ-
ual functional elements, such as:
- Pane flue
- Lateral movement of door
- Smooth operation of door lock
- Operation of combustion shutter
Remove the operating instructions from the furnace
and submit them to the operator together with the
necessary information.
6.2. Positioning of the appliance
Place the appliance on the prepared, load-bearing
support and adjust by means of the mounts.
For buildings with increased sound requirements, the
mounts included were fitted with special sound ab-
sorbers.
6.3. Thermal insulation
The outside surfaces of the appliance must be provid-
ed with a thermal insulation according to the above in-
stallation specifications.
The mandatory convection air gap must be provided
between the device and the thermal insulation.
The thermal insulation must be protected by means of
an abrasion-resistant material.
Содержание JUPITER 510 HK
Страница 1: ...SMART LINE ECO LINE INSTALLATION GUIDE...
Страница 2: ......
Страница 26: ...SMART LINE ECO LINE Installation Guide 26 8 Mars 570 K with ceramic flue example with KMS system...
Страница 34: ...SMART LINE ECO LINE Installation Guide 34 Notes...
Страница 35: ...SMART LINE ECO LINE Installation Guide 35...
Страница 36: ...www ruegg cheminee com 89 90 00454 ma_smart line_en_rev2_07 2013...