
3 | Operation | 3.1 | System Start-up
EN-20
Manual | TM3-3GS
3 | Operation
3.1 | System Start-up
Please ensure that the display unit is connected to the 3G-SDI interface
box by means of the supplied cable (delivery status).
• Connect a digital SDI signal source to the 3G-SDI interface box. Ple-
ase refer to the corresponding notes in the
2 | Installation
chapter
as well as in the
3.2 | Signal Sources and Synchronization
section
(see below).
• Connect the specifi ed power supply to the 3G-SDI interface box. Use
the mains adaptor RTW 1178-R supplied with the TM3-3GS.
• Connect the power supply to the mains supply. After a short boot-up
sequence, the TouchMonitor TM3-3GS will be ready for use.
Содержание TouchMonitor TM3-3G
Страница 1: ...TouchMonitor TM3 3G Smart Manual...
Страница 3: ...DE TouchMonitor TM3 3G Smart Bedienungsanleitung...
Страница 89: ...EN TouchMonitor TM3 3G Smart Operating Manual...