Version 03
– 30.10.2019
Seite 3 von 20
Important Notes
— PLEASE READ CAREFULLY
This manual should be thoroughly read and understood before Installation and
commissioning is undertaken.
The SFCP Rail and its associated connections must be installed, commissioned and
maintained by a suitably lrained, skilled and competent person.
lt is assumed that the person commissioning the system is aware of RSI Austria GmbH
equipment terminology and terrns of reference.
This equipment must be earthed and earth contlnulty must be preserved on broken
segments of screened cable used anywhere in the system installation.
This equipment is not guaranteed unless installed and commissioned in accordance with
current national standards.
This equipment is not suitable as part of an I.T. type power distribution system as defined
in IEC 603644.
A competent person tralned to undertake such work MUST carry out any internal
malntenance. There are no user serviceable parts inside the SFCP Rail. Opening the
moulded PCB will immediately invalidate the warranty.
The SFCP Rail complles wlth EMC-directive 2014/30/EU as well as FCC Regulation In
accordance wlth the following standards:
-
EN 50130-4:2011
-
EN61000-6-3:2007 / A1:2011 / AC:2012
-
FCC CFR 47 part 15:2013
-
EN61000-4-2
-
EN61000-4-3
-
EN61000-4-4
-
EN61000-4-5
-
EN61000-4-6
-
EN61000-4-8
-
EN 50155
-
EN 50121-3
-
EN 60068
-
En 61373
C E
The policy of RSI Austria GmbH is one of continuous improvement and as such we reserve the
right to make changes to product specifications at any time and without prior notice.
Errors and omissions excepted.
Содержание SFCP Rail
Страница 19: ...Version 03 30 10 2019 Seite 19 von 20 ...