17
To
Power Pack
TRACK
Terminals
Attach to
Isolated
TRACK
Attach to
Common
TRACK
Isolator
Isolator
2 Trains on 1Track - Block Control Hookup Diagram
Place MAGNET
on bottom of engines.
For two trains on one track this is all you need to do.
“Power In” can be attached to the track power to supply voltage (DC trains only) or to a fixed 6 volt “wall wart”. See
the power page for more details.
Remove any YardMaster time delays or lap counts if they have been programmed. A factory reset will do this also.
Change the direction of transformer so train runs as shown and adjust the speed as desired. It may be necessary
to experiment with the
switch GREEN
sensor location to obtain the desired results.
The signal light is optional but adds to the fun.
Switch Green
Sensor
Switch RED
Sensor
Green Terminal
Optional
Signal Light
Block
Control
Power in
goes to
transformer
Operation:
When a train exits the isolated block the
switch RED
sensor
will kill power to the block and cause the next train that enters
the block to stop.
When the train crosses over the
switch GREEN
sensor the
block will energize and the stopped train will run
.
For both trains to run at the same time place the
switch GREEN
sensor
about half way around, and closer to the switch RED sensor. For a
longer stop at the isolated block place the
switch Green
sensor closer
to the isolated block.
RRConcepts.com
1
2
3
4
5
6
20
19
18
17
16
15
7
11
8
12
9
13
14
Attach
to Signal light terminals