background image

Product overview:

Dimensions

WATER-MIZER

®

dimensions.

2

Product overview

FLOOR

DIM

DESCRIPTION

INCHES

MM

A

HEIGHT OF MOUNTING PLATE

8-1/2

216

B

WIDTH OF MOUNTING PLATE

6

152

C

WIDTH OF MOUNTING PLATE AND TEMPERED WATER OUTLET

7-1/2

191

D

LENGTH FROM COLD WATER INLET VALVE TO MOUNTING PLATE

12

305

E

LENGTH FROM END OF TANK TO MOUNTING PLATE

9-3/4

248

F

LENGTH FROM CENTER OF TEMPERED WATER OUTLET TO MOUNTING PLATE

7-3/8

187

G

HEIGHT FROM BOTTOM OF MOUNTING PLATE TO CENTER OF HOT WATER INLET

9-1/2

241

H

HEIGHT FROM CENTER OF HOT WATER INLET TO TOP OF VACUUM BREAKER

3

76

J

HEIGHT FROM BOTTOM OF MOUNTING PLATE TO CENTER OF TEMPERED WATER OUTLET

4-1/4

108

K

WIDTH OF MOUNTING PLATE HOLES, CENTER TO CENTER

4

102

L

DISTANCE BETWEEN MOUNTING HOLES, CENTER TO CENTER

7

17

M

MOUNTING HOLE

5/16

8

N

COLD WATER INLET PORT SIZE

3/8" FPT

N/A

P

HOT WATER INLET PORT SIZE

1" FPT

N/A

R

AUXILIARY PORT SIZE

1/2" FPT

N/A

S

TEMPERED WATER OUTLET PORT SIZE

2" MPT

N/A

T

HEIGHT WITH FLOOR STAND (FROM FLOOR TO CENTER OF HOT WATER

MIN. 10-1/4 TO

MIN. 260 TO

INLET - 1" [25 MM] INCREMENTS)

MAX. 22-1/4

MAX. 565

DIMENSIONS

Letters not uses: I, O & Q

Содержание WATER-MIZER RPA466

Страница 1: ...d and save these instructions WATER MIZER Water saving tempering device for sterilization equipment Installation operation and maintenance manual Proud to be an ISO 9001 certified company RPI Part RPA...

Страница 2: ...ill have questions call our technical support group at 800 221 9723 x135 Technicians are available from 8 00 a m to 4 30 p m Pacific Time Monday through Friday excluding major holidays For information...

Страница 3: ...s 2 Warranty 9 Installation Installation instructions 3 Mounting 4 WATER MIZER table of contents Table of Contents Operation Start up and operation instructions 5 Maintenance Maintenance instructions...

Страница 4: ...R MIZER through piping connected to the top threaded connection A vacuum breaker prevents backflow into potable water systems Cold water enters through the temperature actuated valve The valve and the...

Страница 5: ...G PLATE TO CENTER OF HOT WATER INLET 9 1 2 241 H HEIGHT FROM CENTER OF HOT WATER INLET TO TOP OF VACUUM BREAKER 3 76 J HEIGHT FROM BOTTOM OF MOUNTING PLATE TO CENTER OF TEMPERED WATER OUTLET 4 1 4 108...

Страница 6: ...o the WATER MIZER as possible Install a cold water shut off valve before the union in the cold water supply line Installation checklist Installation Hot water inlet connection instructions Hot water i...

Страница 7: ...hnique Mounting the WATER MIZER to the frame may require that holes be drilled in the frame Secure WATER MIZER to the frame of the sterilizer by attaching the integral mounting plate to the frame Note...

Страница 8: ...valve s sensor located inside the chamber near the outlet ensures that water leaving the WATER MIZER is less than 140 F 60 C before entering the municipal sewer system Tempered water at 140 F 60 C or...

Страница 9: ...mineral accumulation has occurred remove the split nut holding the sensor in place and remove the thermal sensor from the WATER MIZER chamber Gently clean the sensor with an abrasive pad Do not twist...

Страница 10: ...sor from WATER MIZER and gently remove mineral accumulation with an abrasive pad Do not twist capillary tubing during removal or cleaning Valve is not set properly Adjust valve so drain effluent is be...

Страница 11: ...ve shown below When you order a Replacement Valve with Sensor RPI Part RPV468 you will receive the style shown to the right RPV468 Important Note For Replacement Valve with Sensor please see Important...

Страница 12: ...Any warranty claim must be submitted to RPI in writing within the stated warranty period Two year limited warranty RPI s limited warranty is made in lieu of and RPI dis claims all other warranties wh...

Отзывы: