
Section 2 Installation
SG7 Manual
www.rottlermfg.com
2-10
Power Supply
This machine has the following power requirements:
208 to 240 VAC it shut not exceed 240 Volts
Single Phase
50 or 60 Hertz
15 amps
See illustration below for correct connection of “measured” incoming power. Connect single phase
wiring to the power enclosure, located on the right rear of machine base. The connection point for power
is located inside the enclosure. The connection termination point is the terminal strip located in the
enclosure. Connect L1 to the terminal block located on the left side, L2 (neutral) to the terminal block next
to it. Attach wire from the grounding rod to the third terminal.
Electrically connect in accordance with national and local electrical
codes.
Grounding
This machine must be connected to a good earth ground rod. A 6 foot, 1/2” diameter, 15 OHM, Copper
grounding rod driven into the earth next to the machines is preferred. Not providing a grounding rod could
void factory warranty.
Содержание SG7
Страница 1: ...28 08 2015...
Страница 2: ......
Страница 4: ......
Страница 8: ...Section 1 Introduction SG7 Manual www rottlermfg com 1 4...
Страница 14: ...Section 2 Installation SG7 Manual www rottlermfg com 2 5...
Страница 20: ...Section 2 Installation SG7 Manual www rottlermfg com 2 11...
Страница 27: ...Section 4 Control Definitions SG7 Manual www rottlermfg com 4 1 CONTROL DEFINITIONS...
Страница 28: ...Section 4 Control Definitions SG7 Manual www rottlermfg com 4 2...
Страница 45: ...Section 5 Operating Instructions SG7 Manual www rottlermfg com 5 15 Rottler Six and One Instructions...
Страница 46: ...Section 5 Operating Instructions SG7 Manual www rottlermfg com 5 16...
Страница 47: ...Section 5 Operating Instructions SG7 Manual www rottlermfg com 5 17...
Страница 50: ...Section 5 Operating Instructions SG7 Manual www rottlermfg com 5 20...
Страница 58: ...Section 6 Maintenance SG7 Manual www rottlermfg com 6 7...
Страница 66: ...Section 7 Troubleshooting SG7 Manual www rottlermfg com 7 7...
Страница 71: ...Section 8 Machine Parts SG7 Manual www rottlermfg com 8 4 Machine Parts Cabinet Table Riser Assembly...
Страница 73: ...Section 8 Machine Parts SG7 Manual www rottlermfg com 8 6 Base Assembly...
Страница 76: ...Section 8 Machine Parts SG7 Manual www rottlermfg com 8 9 Spindle Assembly...
Страница 79: ...Section 8 Machine Parts SG7 Manual www rottlermfg com 8 12 Transmission Assembly...
Страница 81: ...Section 8 Machine Parts SG7 Manual www rottlermfg com 8 14 Head Support Assembly...
Страница 85: ...Section 8 Machine Parts SG7 Manual www rottlermfg com 8 18 SG7 Electrical Components...
Страница 86: ...Section 8 Machine Parts SG7 Manual www rottlermfg com 8 19 SG7 Pneumatic Drawing...
Страница 88: ...Section 9 Options SG7 Manual www rottlermfg com 9 2...
Страница 90: ...Section 10 Material Data Safety Sheets SG7 Manual www rottlermfg com 10 2...
Страница 91: ...Section 10 Material Data Safety Sheets SG7 Manual www rottlermfg com 10 3...
Страница 92: ...Section 10 Material Data Safety Sheets SG7 Manual www rottlermfg com 10 4...
Страница 93: ...Section 10 Material Data Safety Sheets SG7 Manual www rottlermfg com 10 5...
Страница 94: ...Section 10 Material Data Safety Sheets SG7 Manual www rottlermfg com 10 6...
Страница 95: ...Section 10 Material Data Safety Sheets SG7 Manual www rottlermfg com 10 7...
Страница 96: ...Section 10 Material Data Safety Sheets SG7 Manual www rottlermfg com 10 8...
Страница 97: ...Section 10 Material Data Safety Sheets SG7 Manual www rottlermfg com 10 9...
Страница 98: ...Section 10 Material Data Safety Sheets SG7 Manual www rottlermfg com 10 10...
Страница 99: ...Section 10 Material Data Safety Sheets SG7 Manual www rottlermfg com 10 11...
Страница 100: ...Section 10 Material Data Safety Sheets SG7 Manual www rottlermfg com 10 12...
Страница 101: ...Section 10 Material Data Safety Sheets SG7 Manual www rottlermfg com 10 13...
Страница 102: ...Section 10 Material Data Safety Sheets SG7 Manual www rottlermfg com 10 14...