
Section 2 Installation
SG7 Manual
www.rottlermfg.com
2-2
Route to: Service Mgr Andy Machine Packet File
SG7 Installation Report Rev 08202015
ROTTLER SG7 INSTALLATION REPORT
ROTTLER MANUFACTURING MUST HAVE THIS REPORT RETURNED TO
PROPERLY QUALIFY WARRANTY ON EQUIPMENT
Customer:__________________________________ Address:_______________________________________
City:__________________________________ State:_____ Zip:____________ Phone:________________
Machine Model:______________ Serial Number:___________ Representative:________________________
MACHINE INSTALLATION:
Electrical information MUST be complete to validate this report.
Customer is responsible for providing electricity to machine in a manner that meets the local electrical code
requirements.
______
BEFORE
turning power on to the machine. Check all wires for security by using the correct screw driver
and turning CW until movement stops. Stranded wire can “spread” slightly from vibration during transport.
______Check machine level for equal support on feet.
______This machine requires between 208 and 240 Volts AC, Single Phase, 50/60 Hz, isolated power supply.
Measure the incoming voltage between L1 and L2. Current requirements for this machine are 15 amps.
Measure the incoming AC voltage at least twice during installation.
1) __________VAC 2) __________ VAC
______Measure each leg of the incoming supply to ground. When using a one leg and neutral of a 380 VAC three
phase supply L1 should measure 240 VAC and Neutral should measure almost 0 VAC.
L1 to ground _________VAC L2 to ground __________VAC.
Make sure all electrical equipment has the proper overload protection. The SG7 should have a
fully isolated
power supply to prevent damage and uncontrolled movement of the machine. If the SG7 is on the same power
lines that are running to other electrical equipment (grinders, welders, and other AC motors) electrical noise can
be induced into the SG7 electrical system. Electrical noise can cause the controller to see false signals to move.
Neutral and machine ground are not the same thing. You should measure an open
circuit between Neutral and ground.
IF VOLTAGE IS OUTSIDE THE CORRECT RANGE AT ANY TIME THE MACHINE
WILL NOT OPERATE PROPERLY AND MAY BE DAMAGED.
______Air of the proper pressure and capacity connected to the machine. Air supply must be free from oil and
water. Oil or water will damage electrical and air components. Air pressure should never drop below 90
PSI at any time. Failure to provide adequate air supply may cause improper floating and clamping.
______Remove all shipping brackets in accordance with the machine manual.
______Clean any rust inhibitor from the machine surfaces. Slide the spindle base from side to side continually
cleaning the machine base until all inhibitor is removed.
______Have the operator read through the operation manual before training begins. This will help him be familiar
with the button pushing sequences. Have the operator read through the manual again after training and
some of the sequences will make more sense.
______Calibrate angle sensor
Содержание SG7
Страница 1: ...28 08 2015...
Страница 2: ......
Страница 4: ......
Страница 8: ...Section 1 Introduction SG7 Manual www rottlermfg com 1 4...
Страница 14: ...Section 2 Installation SG7 Manual www rottlermfg com 2 5...
Страница 20: ...Section 2 Installation SG7 Manual www rottlermfg com 2 11...
Страница 27: ...Section 4 Control Definitions SG7 Manual www rottlermfg com 4 1 CONTROL DEFINITIONS...
Страница 28: ...Section 4 Control Definitions SG7 Manual www rottlermfg com 4 2...
Страница 45: ...Section 5 Operating Instructions SG7 Manual www rottlermfg com 5 15 Rottler Six and One Instructions...
Страница 46: ...Section 5 Operating Instructions SG7 Manual www rottlermfg com 5 16...
Страница 47: ...Section 5 Operating Instructions SG7 Manual www rottlermfg com 5 17...
Страница 50: ...Section 5 Operating Instructions SG7 Manual www rottlermfg com 5 20...
Страница 58: ...Section 6 Maintenance SG7 Manual www rottlermfg com 6 7...
Страница 66: ...Section 7 Troubleshooting SG7 Manual www rottlermfg com 7 7...
Страница 71: ...Section 8 Machine Parts SG7 Manual www rottlermfg com 8 4 Machine Parts Cabinet Table Riser Assembly...
Страница 73: ...Section 8 Machine Parts SG7 Manual www rottlermfg com 8 6 Base Assembly...
Страница 76: ...Section 8 Machine Parts SG7 Manual www rottlermfg com 8 9 Spindle Assembly...
Страница 79: ...Section 8 Machine Parts SG7 Manual www rottlermfg com 8 12 Transmission Assembly...
Страница 81: ...Section 8 Machine Parts SG7 Manual www rottlermfg com 8 14 Head Support Assembly...
Страница 85: ...Section 8 Machine Parts SG7 Manual www rottlermfg com 8 18 SG7 Electrical Components...
Страница 86: ...Section 8 Machine Parts SG7 Manual www rottlermfg com 8 19 SG7 Pneumatic Drawing...
Страница 88: ...Section 9 Options SG7 Manual www rottlermfg com 9 2...
Страница 90: ...Section 10 Material Data Safety Sheets SG7 Manual www rottlermfg com 10 2...
Страница 91: ...Section 10 Material Data Safety Sheets SG7 Manual www rottlermfg com 10 3...
Страница 92: ...Section 10 Material Data Safety Sheets SG7 Manual www rottlermfg com 10 4...
Страница 93: ...Section 10 Material Data Safety Sheets SG7 Manual www rottlermfg com 10 5...
Страница 94: ...Section 10 Material Data Safety Sheets SG7 Manual www rottlermfg com 10 6...
Страница 95: ...Section 10 Material Data Safety Sheets SG7 Manual www rottlermfg com 10 7...
Страница 96: ...Section 10 Material Data Safety Sheets SG7 Manual www rottlermfg com 10 8...
Страница 97: ...Section 10 Material Data Safety Sheets SG7 Manual www rottlermfg com 10 9...
Страница 98: ...Section 10 Material Data Safety Sheets SG7 Manual www rottlermfg com 10 10...
Страница 99: ...Section 10 Material Data Safety Sheets SG7 Manual www rottlermfg com 10 11...
Страница 100: ...Section 10 Material Data Safety Sheets SG7 Manual www rottlermfg com 10 12...
Страница 101: ...Section 10 Material Data Safety Sheets SG7 Manual www rottlermfg com 10 13...
Страница 102: ...Section 10 Material Data Safety Sheets SG7 Manual www rottlermfg com 10 14...